Skip to content
TimelineConfirmed28 Jan 2012 00:00 UTCISR / remote-control lineage

Orion 123-hour engine bench test

January 2012 · Manassas, Virginia

Open in cross-ref

Propulsion endurance exceeded the 120-hour flight objective on the ground rig before the airframe flew.

Funded in part by the FY2011 $10m USAF below-threshold reprogramming that also paid for a software-integration laboratory.

Sources

  • USAF PB2015 PE 0305205F

Related