Aurora Orion RPA
Twin-diesel MALE UAS · China Lake first flight 24 Aug 2013
CORE air vehicle
Selected air vehicle for MAGIC: a multi-day, medium-altitude remotely piloted ISR platform designed to carry multiple sensors. First flight (24 Aug 2013) had no mission system; the December 2014 endurance record carried ballast. Those two flights do not decide what was fitted on sorties 2–17, including March 2014.
Orion began as a 2007 AFRL ultra-long-endurance study, then was redesigned to twin Austro diesels, ~11,000 lb gross, 1,000 lb payload at 20,000 ft, 132 ft wingspan. USAF budget documentation identifies it as the MAGIC aircraft: multi-day persistence, medium altitude, multiple sensors. Ground tests through May 2013; shipped to NAWS China Lake July 2013; first flight 24 August 2013 (~3.5 hours, 8,000 ft), remotely initiated, no mission payload on that article. Endurance work was planned for mid-2014; Aurora later reported an 80-hour remotely controlled flight in December 2014 with 1,000 lb ballast. Contemporary reporting said several multi-INT payload configurations were under consideration. Gorgon Stare was named in 2010 Aviation Week as a potential MAGIC payload and, as a podded BIG SAFARI system, was regarded by Congress as integrable on more than one airframe. Whether an Orion carried it by 8 March 2014 is open — not shown, and not disproved by the empty first flight.
Sources
- USAF PB2015 PE 0305205F
- Aurora corporate timeline
Related
MAGIC
Medium Altitude Global ISR and Communications
Aurora Flight Sciences
HALE/MALE autonomy house · Orion prime
Gorgon Stare
BIG SAFARI wide-area surveillance · podded, not MQ-9-only
Orion first flight, China Lake
24 August 2013 · ~3.5 hours · 8,000 ft · no mission payload
Orion 80-hour remotely controlled flight
December 2014 · 1,000 lb ballast · fuel for ~37 more hours
Orion flight 18 — 80-hour record with 1,000 lb ballast
December 2014 · not an ISR-payload demonstration
What was on Orion flights 2–17 between August 2013 and March 2014?
Gorgon Stare, Blue Devil and MAGIC/Orion are one overlapping ISR family under BIG SAFARI
Gorgon Stare’s podded architecture was designed for more than MQ-9
MAGIC JCTD initiated
FY2010 Q3 · OSD/DDR&E
Orion 123-hour engine bench test
January 2012 · Manassas, Virginia
Raytheon MTS-B as Orion payload lead
Reported option · 2012–13 USAF UAV MTS bookings in the $200m class
MH370 Daily Research — working papers
18 September 2026
Business Case Analysis of MAGIC UAV System
Naval Postgraduate School thesis · public PDF
Raytheon Space and Airborne Systems
ISIS radar · MTS for USAF UAVs · large classified SAS bookings
NAWS China Lake
Orion first flight · 24 August 2013
A BIG SAFARI collection architecture around MH370
The family is documented. A specific 8 March operation is open.
Orion’s first flight carried no mission system
What sensors were actually on Orion by March 2014?
Where did Blue Devil residual components go?
OSD PB2012 — MAGIC JCTD primary record
PE 0603648D8Z · pp. 32–33 · USCENTCOM sponsor
USAF PB2020 — MAGIC/Orion continued after 2014
PE 0305205F · Congressional adds FY2015–FY2018
FIRST RF Phase II — dual-band UHF/X-band airborne SAR
FA8650-11-C-1016 · $749,593 · start 26 Jan 2011 · topic AF093-138
What platform received the FY2013 dual-band RF Persistent Sensing integration?
Aurora Orion contract FA8620-12-C-3027
~$86.56m aggregated · completion extending to 2019