Skip to content
EvidenceOpen9 Mar 2014Theatre reconstruction

The radar story and the 9 March cyberattack

Working chart · tracks, delays, and a spear-phish of the investigation

Open in cross-ref
The radar story and the 9 March cyberattack
Working chart · radar and the 9 March intrusion

Two panels. Left: civilian secondary, Malaysian military primary, Thai paint disclosed ten days later, and the 12-hour lag before the civilian rescue centre was told. Right: one day after the loss, officials on the investigation were hit with a spear-phish that CyberSecurity Malaysia later said stole classified material toward an IP in China. Presence of a hack is confirmed as that agency’s public account. What was in the take — and whether it included radar — is still open.

The radar panel restates facts already in this file and names two Malaysian Air Defence feeds: BD764 (secondary, 10-second samples, ends when the transponder drops at 01:21 MYT) and BE144 (primary, 10-second samples, westbound after the turn). The chart has BE144 ending at 18:02:59 UTC, with the official reconstruction later resuming to a last military return at 18:22:12 UTC. The 2018 report already describes a Pulau Perak paint near 18:01:59, a gap, then 18:15:25–18:22:12. The live question is the source of those later points, not whether a westbound primary track exists. Thai Surat Thani, the ministerial 10:30 / ARCC 22:30 lag, and altitude/speed blips beyond 777 performance are already confirmed separately. The cyber panel is the 9 March intrusion of investigation networks — filed as its own event. A working chart is not a finding that the hack explains the radar delays, or that radar data was in the stolen set.

Sources

  • Working chart · radar story and 9 March cyberattack
  • Malaysian Safety Investigation Report 2018 — radar reconstruction

Related