Skip to content

Resources

Resources

Official papers, films, Wikipedia and its citations, programmes, claims and open questions.

19 hits

DocumentUnverified1 Jan 2026

Project Quiet Exodus — Part 1

SecretMilitaryTechnology.com thesis · asset denial of the Freescale team

A long-form thesis that MH370 was a US operation to stop twenty Freescale employees reaching China, protecting a compact-fusion / spacetime platform. Public facts inside it (headcount, Carlyle, Lockheed CFR patents, HA08 outage, UCT-2 at Diego Garcia) are filed separately. The operation itself is not established.

DocumentOfficial finding9 Dec 2025 00:00 UTC

Ashton Hall — plasma-orb negative finding

Project file · December 2025

Author-level reading of Franklin Mead / AFRL propulsion literature. It does not support metre-scale manufactured plasma orbs.

DocumentOfficial finding18 Sep 2026 00:00 UTC

MH370 / US Military ISR Working Research Report v1

Working paper · 18 September 2026

Working paper on US military ISR programmes in the MH370 window: MAGIC, Orion, Gorgon Stare, Blue Devil and remote-control patents, read as one overlapping family under BIG SAFARI. The family is documented. A specific MH370 collection is not established and is not ruled out.

DocumentConfirmed18 Sep 2026 22:50 UTC

MH370 Daily Research — working papers

18 September 2026

Working ISR report, source ledger and master chronology gathered the same day, with a cited-URL set pointing at contemporary MAGIC, Orion and Gorgon Stare reporting.

DocumentOfficial finding20 Sep 2026 00:00 UTC

MH370 Research Master Log

Investigation chronology · 18–20 September 2026

Running chronology of findings: cargo, 2011–2013 ISR programmes, radar disclosure on the westbound track, MAGIC budget exhibits, and the alleged-video file.

DocumentOfficial finding18 Sep 2026 00:00 UTC

Source archive index

18 September 2026 · source register

Index of the important sources in the ISR investigation, with a status for each: full text, targeted extract, archived copy, snapshot, lead only, or still to be upgraded.

TimelineConfirmed23 May 2012 00:00 UTC

Blue Devil II stopped; hardware to Greenville

Payload stop 4 Jan 2012 · pack-out May 2012 · storage Q4 FY2012

Airship programme killed. Equipment packed and transferred to a BIG SAFARI-managed facility in Greenville, Texas. Components were available for other projects. Residual parts were later absorbed into other Air Force programmes.

PersonConfirmed

Franklin B. Mead Jr.

AFRL propulsion · Mead corpus does not support manufactured plasma orbs

Beamed-energy / aneutronic-fusion / laser-thermal propulsion. Dense-plasma-focus plasmoids in his papers are centimetre-scale, device-bound and transient. The 2004 Teleportation Physics Study (Davis; Mead as project manager) is theoretical. No pathway to metre-scale autonomous atmospheric orbs.

LocationConfirmed

Greenville, Texas

BIG SAFARI facility · Blue Devil II GFE available for other programmes

Q4 FY2012 destination of stopped Blue Devil II airship equipment, including government-furnished components. FY2014 USAF budget language: components available for other projects. Later inventory, including March 2014, is not published.

OrganisationConfirmed15 Oct 2014

Lockheed Martin Compact Fusion Reactor

Public Skunk Works programme · Thomas McGuire · not an MH370 finding

Confirmed as a public Lockheed Skunk Works fusion project, discussed openly around 2014, with patents including US9947420 (magnetic-field plasma confinement; filing family 2 April 2014). Quiet Exodus treats it as the power core of a clandestine spacetime platform. That leap is the thesis, not the patent.

DocumentConfirmed11 Feb 2026

They May As Well Have Been Flying the Plane

MH370 song, February 2026

Nic Moneypenny’s MH370 song: who signed off the project; FOIA walls; families still waiting. Dedicated to the search for what is still held back as national security.

EvidenceConfirmed8 Mar 2014 00:00 UTC

Twenty Freescale employees on MH370

Company-confirmed 8 March 2014

Confirmed passenger fact. Project assignments, especially defence/avionics/inertial work, are unresolved. FXAS21000 gyro sampling in July 2013 is an adjacent product date only.

Open questionOpen

Where did Blue Devil residual components go?

Block 2 equipment, including government-furnished components, was packed and transferred to a BIG SAFARI-managed facility in Greenville, Texas, available for other projects. Residual parts were absorbed into other Air Force programmes. Later inventory — including March 2014 — is not published.

OrganisationConfirmed

645 AESG / BIG SAFARI

USAF rapid acquisition — the office that binds this family

645 AESG / BIG SAFARI ran specialised rapid-development ISR. It executed MAGIC, developed Gorgon Stare, and took Blue Devil equipment into a facility it managed at Greenville, Texas. That is the documented organisational centre of this technology family, not a coincidence of names.

HypothesisOpen

A BIG SAFARI collection architecture around MH370

The family is documented. A specific 8 March operation is open.

Gorgon Stare, Blue Devil and MAGIC/Orion are one overlapping ISR family under 645 AESG / BIG SAFARI: same office, overlapping WAMI/SIGINT sensors, reusable GFE through Greenville, and a podded architecture meant to move between airframes. That family is confirmed. Whether any of it collected MH370 is not established and is not ruled out.

OrganisationConfirmed14 Mar 2011 00:00 UTC

Blue Devil I / II

Operational Block 1 WAAS + SIGINT · Block 2 residuals to BIG SAFARI

Block 1 was operational: manned aircraft carrying Angel Fire-derived wide-area imagery integrated with SIGINT. Block 2, the airship, was terminated — but its equipment, including GFE, was packed and sent to a BIG SAFARI facility in Greenville, Texas, available for other programmes. The technology did not vanish with the airship.

DocumentConfirmed19 Sep 2013 00:00 UTC

DODIG-2013-128 — Blue Devil Block 2

DoD Inspector General · 19 September 2013 · 54 pages · Drive source copy

Primary. FA8620-11-C-4024, ~$149m spent, payload stop 4 Jan 2012, residual components absorbed into other Air Force programmes.

DocumentConfirmed26 Jan 2011

FIRST RF Phase II — dual-band UHF/X-band airborne SAR

FA8650-11-C-1016 · $749,593 · start 26 Jan 2011 · topic AF093-138

Official SBIR: lightweight dual-band UHF/X-band SAR on a modified Artemis COTS radar plus FIRST RF single-aperture antenna. SWaP ~20 lb / 150 W. Design target included Shadow 200. A concrete alternative to treating Orion as the unnamed FY2013 RF Persistent Sensing platform.

Open questionOpen

What were the 20 Freescale passengers working on?

Presence on the flight is confirmed. Defence/avionics/inertial/radar assignment is unresolved. FXAS21000 gyro timing is an adjacent product fact, not a link.

273 records in the file.