OrganisationConfirmed14 Mar 2011 00:00 UTC

Blue Devil I / II

Operational Block 1 WAAS + SIGINT · Block 2 residuals to BIG SAFARI

CORE sensor lineage

Open in cross-ref

Block 1 was operational: manned aircraft carrying Angel Fire-derived wide-area imagery integrated with SIGINT. Block 2, the airship, was terminated — but its equipment, including GFE, was packed and sent to a BIG SAFARI facility in Greenville, Texas, available for other programmes. The technology did not vanish with the airship.

Blue Devil is routinely misread as only a failed airship. Block 1 used contractor King Air C90s with an integrated pod: Angel Fire-derived WAAS imagery, night imagery, FMV and SIGINT cueing. Congressional documentation describes that integration. NSA and JIEDDO supported it; a SIGINT intercept could cue WAAS then narrow-FOV video. PED used NSA-Net, Trojan Spirit SATCOM and DIA VSAT. SAIC contract FA8650-10-C-1887 grew to ~$243.5m by August 2013. The operational demonstration ended 31 December 2013 and the leased King Airs were returning to Leidos; the government-owned sensor package remained, and was being assessed for reassignment. Block 2 (MAV6 FA8620-11-C-4024, initially $86.2m, 14 March 2011) tried the same architecture on a 5–7 day airship. Payload integration stopped 4 January 2012; airship work ended May 2012; ~$149m spent. FY2014 USAF budget records: equipment including GFE packed and transferred to a BIG SAFARI-managed facility in Greenville, Texas, components available for other projects. DODIG-2013-128: residual components absorbed into other Air Force programmes. HASC 113-102 named Gorgon Stare the logical recapitalisation of Blue Devil WAMI + NVDF SIGINT. Whether any of that hardware or architecture sat on Orion, MQ-9 or another host on 8 March 2014 is open.

Sources

Related

OrganisationConfirmed

645 AESG / BIG SAFARI

USAF rapid acquisition — the office that binds this family

OrganisationConfirmed1 Jul 2014 00:00 UTC

Gorgon Stare

BIG SAFARI wide-area surveillance · podded, not MQ-9-only

Open questionOpen

Where did Blue Devil residual components go?

DocumentConfirmed19 Sep 2013 00:00 UTC

DODIG-2013-128 — Blue Devil Block 2

DoD Inspector General · 19 September 2013 · 54 pages · Drive source copy

OrganisationConfirmed

Angel Fire

Wide-area airborne surveillance · lineage into Blue Devil Block 1

TimelineProbable31 Dec 2013

Blue Devil I operational demonstration ends

31 December 2013 · four King Airs returning to Leidos

ClaimConfirmed

Gorgon Stare, Blue Devil and MAGIC/Orion are one overlapping ISR family under BIG SAFARI

DocumentConfirmed7 Jun 2013

HASC Report 113-102 — Gorgon Stare to recapitalise Blue Devil

House Armed Services Committee · 7 June 2013 · USD(I)/USAF report due 14 Feb 2014

TimelineConfirmed23 May 2012 00:00 UTC

Blue Devil II stopped; hardware to Greenville

Payload stop 4 Jan 2012 · pack-out May 2012 · storage Q4 FY2012

OrganisationConfirmed1 Jul 2010 00:00 UTC

MAGIC

Medium Altitude Global ISR and Communications

LocationConfirmed

Greenville, Texas

BIG SAFARI facility · Blue Devil II GFE available for other programmes

HypothesisOpen

A BIG SAFARI collection architecture around MH370

The family is documented. A specific 8 March operation is open.

EvidenceUnverified18 Sep 2026

Blue Devil, MAGIC, Orion, BIG SAFARI — 2014 window

Briefing collages, 18 September 2026

Open questionOpen

Where is the 14 February 2014 USD(I)/USAF Gorgon Stare / Blue Devil strategy report?

Open questionOpen

Where was the Blue Devil I government-owned sensor package in January–March 2014?

DocumentConfirmed12 Dec 2012

FY2013 NDAA Sec. 927 — integrated SIGINT / WAMI plan

Congressional Record 12 Dec 2012 · ISR Task Force plan due 1 Jan 2013

OrganisationConfirmed1 Jan 2012

DARPA WAND

Wide Area Network Detection · coincident WAMI + RF

TimelineConfirmed17 Aug 2011

L-3 Greenville awarded Blue Devil 2 integration / test

FA8620-06-G-4003 / order 1157 · $12.054m · 17 Aug 2011