Resources
Resources
Official papers, films, Wikipedia and its citations, programmes, claims and open questions.
10 hits
Project Quiet Exodus — Part 1
SecretMilitaryTechnology.com thesis · asset denial of the Freescale team
A long-form thesis that MH370 was a US operation to stop twenty Freescale employees reaching China, protecting a compact-fusion / spacetime platform. Public facts inside it (headcount, Carlyle, Lockheed CFR patents, HA08 outage, UCT-2 at Diego Garcia) are filed separately. The operation itself is not established.
Asset denial of the Freescale team
Quiet Exodus thesis · not adopted as a finding
Hypothesis: the United States removed twenty Freescale employees from China’s reach, using a clandestine compact-fusion platform, because they were the programme’s irreplaceable integration unit. Headcount is confirmed. The programme-link, the intercept, and the 18:22 structural kill are not.
Quiet Exodus: HA08 was blinded on purpose — not established
Outage confirmed · deliberate cut not shown · depths argue against UCT-2
The thesis treats the March 2014 HA08 North cable fault plus UCT-2’s presence as an acoustic blackout for MH370. The outage is real. The published UCT-2 task is near-shore anode work. HA08 South and HA01 kept listening. Deliberate blinding remains a hypothesis.
Lockheed Martin Compact Fusion Reactor
Public Skunk Works programme · Thomas McGuire · not an MH370 finding
Confirmed as a public Lockheed Skunk Works fusion project, discussed openly around 2014, with patents including US9947420 (magnetic-field plasma confinement; filing family 2 April 2014). Quiet Exodus treats it as the power core of a clandestine spacetime platform. That leap is the thesis, not the patent.
CTBTO HA08 North at Diego Garcia went dark in March 2014
Cable break ~189 km offshore · South array kept listening
Confirmed by CTBTO. The northern hydroacoustic segment of HA08, off Diego Garcia, suffered a trunk-cable fault in March 2014 about 189–190 km from shore, more than a kilometre and a half down. HA08 South continued. North stayed silent for twelve years. A conventional splash in the southern Indian Ocean is not thereby erased — Cape Leeuwin (HA01) and HA08 South remained in the network.
UCT-2 inspected near-shore HDAS cables at Diego Garcia
February–early March 2014 · 110 ft of water · zinc anodes
Confirmed Seabee deployment. Construction Diving Detachment Charlie spent February and early March at NSF Diego Garcia on fleet moorings and Hydro-acoustic Data Acquisition System cables. Final task: inspect and repair two HDAS cables north of the lagoon in about 110 feet of seawater. That is not the 189 km / 1.5 km-deep HA08 North trunk.
What can be documented at Diego Garcia on 7–8 March 2014?
HA08 North’s trunk failed in March 2014 about 189 km off Diego Garcia; UCT-2 was on the atoll doing near-shore HDAS anode work in 110 ft of water. Sensor, SIGINT, satellite-downlink and aircraft records for 7–8 March are still the question — not a finding.
MAGIC, Aurora and Boeing/NRL patents drop from the paper trail in 2014
Follow-up briefing: Aurora’s remote-operation work for the US military from about 2010; MAGIC and several Boeing and NRL patents then become hard to find in open documents in 2014. Redacted Blue Devil letters are shown with matching date cut-offs.
MAGIC/Orion continued in USAF development after 2014
Confirmed by PB2020. Congressional adds through FY2018. The ‘faded after 2014’ formulation is a correction, not a secrecy finding.
The Debris Swarm
Jeff Wise · Finding MH370 S1E19 · 15 November 2024 · 39:26
After six months with only the Réunion flaperon, a cluster of western-Indian-Ocean pieces appears in 2016. CSIRO reverse-drift and barnacle work are the scientific spine; the swarm’s timing is the puzzle Wise keeps open.
273 records in the file.