Skip to content

Resources

Resources

Official papers, films, Wikipedia and its citations, programmes, claims and open questions.

17 hits

DocumentOfficial finding20 Sep 2026 00:00 UTC

MH370 Research Master Log

Investigation chronology · 18–20 September 2026

Running chronology of findings: cargo, 2011–2013 ISR programmes, radar disclosure on the westbound track, MAGIC budget exhibits, and the alleged-video file.

EvidenceConfirmed4 Mar 2014

Boeing–NAVAIR delivery order signed 4 March 2014

$955,853.54 · N0001914D0012 · engineering/technical support · St Louis

Confirmed public contracting record, four days before MH370. Department of the Navy, Naval Air Systems Command, NAICS aircraft manufacturing, PSC R425 professional engineering/technical support. Subject of the order is not in the public header. Chronology is not a collection event.

DocumentConfirmed18 Sep 2026 22:50 UTC

MH370 Daily Research — working papers

18 September 2026

Working ISR report, source ledger and master chronology gathered the same day, with a cited-URL set pointing at contemporary MAGIC, Orion and Gorgon Stare reporting.

TimelineConfirmed7 Mar 2014

Raytheon MTS award for HC/MC-130J — one day before MH370

$10.072556m · 10 systems · 7 March 2014

Chronology fact only. No evidence these turrets or aircraft observed MH370. HD-capable MTS-B was entering USAF inventory through 2013–14.

Open questionOpen

Where is the 14 February 2014 USD(I)/USAF Gorgon Stare / Blue Devil strategy report?

HASC 113-102 required it 22 days before MH370. It may name platforms, residual Blue Devil components, integration status and fielding chronology.

DocumentUnverified1 Feb 2026

4ORBS — Ashton Forbes video knowledge base

Third-party extract of 824 videos · a claim list, not proof

Structured archive extracted from 824 Ashton Forbes videos. Distinguishes extracted claims from proof. Every material proposition still has to be traced to the original document or video.

HypothesisUnverified

Alleged thermal / wide-area video is authentic collection

Hypothesis to test — provenance not established

Circulating clips are treated as alleged. If genuine, at least one collector must satisfy geometry, band, FOV, altitude and comms. Platform IDs attached to social posts are not accepted as authority. A ~6 fps ‘Gorgon Stare Increment 2 match’ is contradicted by the 2013 OSD 2 fps figure.

PersonUnverified

Ashton Forbes

Independent researcher · alleged thermal and wide-area video

Source of widely circulated alleged thermal/WAMI videos and platform identifications. Those identifications are hypotheses, not findings. Plasma-orb claims are treated as unsubstantiated. A third-party extract of 824 of his videos is a claim list, not proof. Edward C. Lin FOIA does not name MH370.

EvidenceOfficial finding7 Mar 2014 17:21 UTC

Malaysian military primary-radar track

17:21–18:22 UTC · westbound after IGARI

Primary radar paints a left turn off the Beijing airway, a crossing of the peninsula, and a track up the Strait of Malacca until 18:22 UTC. Altitude/speed blip-to-blip in the file are noisier than 777 performance.

DocumentProbable29 Jul 2025

MH370 Disappearance: Minute by Minute

Licensed 53-minute feature · 2025–26 reprints

The same ~53:13 timeline film appears under DocuReal, Spark, Wonder, Real Stories and Progress with new title cards. Content is the public night: 00:41 takeoff, 01:19 sign-off, Malacca radar, Inmarsat, African debris.

EvidenceUnverified

Raytheon MTS-B as Orion payload lead

Reported option · 2012–13 USAF UAV MTS bookings in the $200m class

MTS-B is EO/IR FMV/targeting. Aviation Week 2010 attributed a planned pair of MTS-B turrets on Orion — planned, not fitted on the maiden article. Flight 18 (Dec 2014) carried 1,000 lb ballast. Raytheon 10-K totals do not identify Orion as the customer.

TimelineConfirmed8 Mar 2014 02:00 UTC

Surface search begins in the South China Sea

8 March 2014

Ships and aircraft search the Gulf of Thailand / South China Sea along the filed route — the wrong ocean for several days.

TimelineProbable7 Apr 2014

USAF: Gorgon Stare Increment 2 ‘tried operationally’

Air & Space Forces · 7 April 2014 · Col Brandon Baker

A named USAF official puts Increment 2 operational-trial activity by early April 2014. It does not establish airborne availability on 7–8 March.

Open questionOpen

Was Gorgon Stare Increment 2 operational on 8 March 2014?

Sierra Nevada (1 Jul 2014): deployed to Afghanistan ‘earlier this year’ and at IOC. Air & Space Forces (7 Apr 2014): Col Brandon Baker — second iteration ‘has been tried operationally’ and would undergo a six-month evaluation. Mercury SEC: 18-month QRC delivery from a 2011 win. None of these pin 7–8 March.

TimelineOfficial finding8 Mar 2014 14:30 UTC

RMAF notifies KL ARCC of the western military track

22:30 MYT 8 March 2014 · ~12 hours after the minister

SAR chronology: civilian rescue centre informed of the possible turn-back / western last-known at 22:30 Malaysian time. Ministerial awareness ~10:30. The gap is a documented information-latency issue, not by itself a finding of a cover-up.

Open questionOpen

What platform received the FY2013 dual-band RF Persistent Sensing integration?

PB2015: completed and integrated onto an ‘identified platform,’ then the effort ended. Public exhibits do not name it. FIRST RF / Shadow 200 and ISIS test-facility work are documented UHF/X-band alternatives. Orion is chronology-only.

DocumentProbable8 Mar 2014

Wikipedia timeline — night of 7–8 March 2014

Duty sign-in through failed 09:15 handshake

Compiled public chronology: captain sign-in 22:50 MYT 7 March, F/O 23:15, SDU log-on 00:00, push 00:27, takeoff 00:42, FL350 01:01, last ACARS 01:07, last voice 01:19:30, transponder 01:21:13, Penang cell 01:52, last radar 02:22, SDU log-on 02:25, hourly pings, last transmission 08:19:37, no reply 09:15.

273 records in the file.