Skip to content
EvidenceConfirmed7 Mar 2014 16:00 UTC

Inmarsat signalling-unit log for 9M-MRO

Perth Ground Earth Station · 7–8 March 2014

Open in cross-ref

The table of channel, BTO, BFO and message type that underpins every arc on every search map. Released by Malaysia with Inmarsat notes.

Malaysia released a readable extract of the Inmarsat ground-earth-station log covering 9M-MRO from about 16:00 UTC on 7 March through the failed interrogation at 01:16 UTC on 8 March. Each line is a signalling unit, not a position report. BTO is a round-trip timing residual; BFO is a frequency residual. R600 versus R1200 channels need different BTO calibration. The SDU logged on at 18:25 UTC (Handshake 1), exchanged hourly handshakes, and sent an aircraft-initiated log-on at 00:19:29 UTC (Handshake 7). Anyone doing independent path reconstruction is reconstructing from this table.

Sources

  • Explanatory Notes for Satellite Communication Logs, MH370

Related