Resources
Resources
Official papers, films, Wikipedia and its citations, programmes, claims and open questions.
32 hits
MAGIC
Medium Altitude Global ISR and Communications
USAF endurance-ISR programme. Air vehicle: Aurora Orion. Office: 645 AESG / BIG SAFARI — the same rapid-acquisition group that ran Gorgon Stare and took Blue Devil residuals. Confirmed as a multi-day ISR platform in that family. A specific MH370 operation is not established and is not ruled out.
Lockheed Martin Compact Fusion Reactor
Public Skunk Works programme · Thomas McGuire · not an MH370 finding
Confirmed as a public Lockheed Skunk Works fusion project, discussed openly around 2014, with patents including US9947420 (magnetic-field plasma confinement; filing family 2 April 2014). Quiet Exodus treats it as the power core of a clandestine spacetime platform. That leap is the thesis, not the patent.
A BIG SAFARI collection architecture around MH370
The family is documented. A specific 8 March operation is open.
Gorgon Stare, Blue Devil and MAGIC/Orion are one overlapping ISR family under 645 AESG / BIG SAFARI: same office, overlapping WAMI/SIGINT sensors, reusable GFE through Greenville, and a podded architecture meant to move between airframes. That family is confirmed. Whether any of it collected MH370 is not established and is not ruled out.
Greenville, Texas
BIG SAFARI facility · Blue Devil II GFE available for other programmes
Q4 FY2012 destination of stopped Blue Devil II airship equipment, including government-furnished components. FY2014 USAF budget language: components available for other projects. Later inventory, including March 2014, is not published.
Asset denial of the Freescale team
Quiet Exodus thesis · not adopted as a finding
Hypothesis: the United States removed twenty Freescale employees from China’s reach, using a clandestine compact-fusion platform, because they were the programme’s irreplaceable integration unit. Headcount is confirmed. The programme-link, the intercept, and the 18:22 structural kill are not.
Blue Devil I / II
Operational Block 1 WAAS + SIGINT · Block 2 residuals to BIG SAFARI
Block 1 was operational: manned aircraft carrying Angel Fire-derived wide-area imagery integrated with SIGINT. Block 2, the airship, was terminated — but its equipment, including GFE, was packed and sent to a BIG SAFARI facility in Greenville, Texas, available for other programmes. The technology did not vanish with the airship.
Blue Devil II stopped; hardware to Greenville
Payload stop 4 Jan 2012 · pack-out May 2012 · storage Q4 FY2012
Airship programme killed. Equipment packed and transferred to a BIG SAFARI-managed facility in Greenville, Texas. Components were available for other projects. Residual parts were later absorbed into other Air Force programmes.
Gorgon Stare, Blue Devil and MAGIC/Orion are one overlapping ISR family under BIG SAFARI
Confirmed by Congressional and USAF budget records. Same office, overlapping sensors (WAMI, SIGINT, airborne processing), shared GFE path through Greenville, and a podded architecture meant to move between airframes. Not isolated programmes that happen to share a decade.
MH370 / US Military ISR Working Research Report v1
Working paper · 18 September 2026
Working paper on US military ISR programmes in the MH370 window: MAGIC, Orion, Gorgon Stare, Blue Devil and remote-control patents, read as one overlapping family under BIG SAFARI. The family is documented. A specific MH370 collection is not established and is not ruled out.
MH370 Research Master Log
Investigation chronology · 18–20 September 2026
Running chronology of findings: cargo, 2011–2013 ISR programmes, radar disclosure on the westbound track, MAGIC budget exhibits, and the alleged-video file.
Where did Blue Devil residual components go?
Block 2 equipment, including government-furnished components, was packed and transferred to a BIG SAFARI-managed facility in Greenville, Texas, available for other projects. Residual parts were absorbed into other Air Force programmes. Later inventory — including March 2014 — is not published.
DODIG-2013-128 — Blue Devil Block 2
DoD Inspector General · 19 September 2013 · 54 pages · Drive source copy
Primary. FA8620-11-C-4024, ~$149m spent, payload stop 4 Jan 2012, residual components absorbed into other Air Force programmes.
HASC Report 113-102 — Gorgon Stare to recapitalise Blue Devil
House Armed Services Committee · 7 June 2013 · USD(I)/USAF report due 14 Feb 2014
Primary Congressional source: Gorgon Stare is the USAF’s only operational persistent day/night WAMI capability and the logical programme to recapitalise Blue Devil technologies, capabilities and lessons learned. Directed evolution into WAMI + near-vertical direction-finding SIGINT, leveraging Blue Devil PED. Report due 14 February 2014 — 22 days before MH370.
ISIS
Integrated Sensor Is Structure · DARPA/USAF airship radar
Same PE as MAGIC. Lockheed integrator, Raytheon radar, ~$400–462m. Stratospheric airship with very large low-power radar. Confirmed programme; no evidence of MH370 collection.
RegicideAnon satellite-video upload — 19 May 2014
Public upload date archivable; claimed 12 March receipt is not verified by that fact
Confirmed public-upload date. Description’s claimed ‘received 12 March 2014’ remains a separate, unverified field. Provenance of the file itself is still the core video question.
USAF 303rd AESW
Named MAGIC transition organisation in OSD PB2012
OSD planned to provide MAGIC core technologies to the 303rd Aeronautical Systems Wing for further development of a deployable long-endurance UAS. Confirmed as a named office; later 645 AESG / BIG SAFARI execution is a separate fact.
645 AESG / BIG SAFARI
USAF rapid acquisition — the office that binds this family
645 AESG / BIG SAFARI ran specialised rapid-development ISR. It executed MAGIC, developed Gorgon Stare, and took Blue Devil equipment into a facility it managed at Greenville, Texas. That is the documented organisational centre of this technology family, not a coincidence of names.
A specific MH370 collection event is not yet on the record — and is not ruled out
MAGIC/Orion, Gorgon Stare and Blue Devil form a documented overlapping family under BIG SAFARI. That family is not, by itself, a platform, sensor or sortie on 8 March 2014. The same material does not rule such a deployment out.
Blue Devil, MAGIC, Orion, BIG SAFARI — 2014 window
Briefing collages, 18 September 2026
Nic Moneypenny published investigation collages placing Blue Devil (including an egg-shaped airship), MAGIC, Aurora Orion, BIG SAFARI, Lockheed and DARPA in the same 2013–14 spending window as MH370, with Freescale’s last gyro presentation among the plates.
DSTG Bayesian flight-path analysis
Defence Science and Technology Group, Australia
A probabilistic reconstruction of MH370’s path from SATCOM metadata. Output is a distribution along the 7th arc, not a pin in the map.
Freescale last presentation — gyroscopic sensors
Plate from the 18 September 2026 collage: pages of a Freescale presentation on gyroscopic sensors, identified as among the last formal materials before twenty employees boarded MH370.
Gorgon Stare
BIG SAFARI wide-area surveillance · podded, not MQ-9-only
Developed through BIG SAFARI. Increment 2 is ARGUS-derived EO plus Exelis IR. Congress treated the podded/open architecture as integrable on more than one aircraft type. MQ-9 is the documented host; an Orion fit by 8 March 2014 is open. 2013 OSD figure: 2 fps, not 6.
Interstate politics — China, Russia, Iran
Manifest geography is not a state-act finding
Destination Beijing, Chinese majority, Iranian stolen-passport travellers, one Russian national. Facts of who was on board. Not a finding of PLA, FSB, or IRGC action.
L-3 Greenville awarded Blue Devil 2 integration / test
FA8620-06-G-4003 / order 1157 · $12.054m · 17 Aug 2011
L-3 Communications Integrated Systems, Greenville, Texas, paid for BD2 airship integration and test support. Later Q4 FY2012 storage was also at a 645 AESG-managed Greenville facility. Geographic coincidence is not a custody finding.
MAGIC/Orion continued in USAF development after 2014
Confirmed by PB2020. Congressional adds through FY2018. The ‘faded after 2014’ formulation is a correction, not a secrecy finding.
MH370 Daily Research — working papers
18 September 2026
Working ISR report, source ledger and master chronology gathered the same day, with a cited-URL set pointing at contemporary MAGIC, Orion and Gorgon Stare reporting.
Michael Selig testimony — Diego Garcia, Gorgon Stare, cold plasma
Nic Moneypenny notes a written and recorded account by Michael Selig, former fast-jet pilot who flew into Diego Garcia, describing an MH370 end-state, a leaked video, Gorgon Stare and scalar / plasma language.
Orion first flight, China Lake
24 August 2013 · ~3.5 hours · 8,000 ft · no mission payload
Remote launch from GCS. Air vehicle and command link demonstrated. ISR stack not yet fitted.
Orion flight 18 — 80-hour record with 1,000 lb ballast
December 2014 · not an ISR-payload demonstration
Aurora’s endurance attempt was flight 18 and carried 1,000 lb of ballast. Maiden flight (no mission system) and this record flight both fail as evidence of an operational ISR stack. Payload on flights 2–17 remains open.
Orion’s first flight carried no mission system
Confirmed by contemporary September 2013 reporting and consistent with PB2015’s FY2014 “best of breed” sensor-selection language. December 2014 endurance attempt was flight 18 with 1,000 lb ballast — also not an ISR-payload demonstration. Those two flights do not decide what Orion was, and they do not decide March 2014.
Project Quiet Exodus — Part 1
SecretMilitaryTechnology.com thesis · asset denial of the Freescale team
A long-form thesis that MH370 was a US operation to stop twenty Freescale employees reaching China, protecting a compact-fusion / spacetime platform. Public facts inside it (headcount, Carlyle, Lockheed CFR patents, HA08 outage, UCT-2 at Diego Garcia) are filed separately. The operation itself is not established.
Remote-control claims versus evidence gaps
Patent, QF-16, Teso FMS proof-of-concept · installation on 9M-MRO still open

Working chart: unmanned flight of a fighter-class jet was demonstrated in 2013; Boeing’s uninterruptible-autopilot patent exists; Hugo Teso showed an FMS proof-of-concept the same year. Boeing told Malaysian investigators there was no commercial implementation on the 2002 delivery. Radar proves a turn at IGARI, not who commanded it. Ten data requests remain.
273 records in the file.