Skip to content

Resources

Resources

Official papers, films, Wikipedia and its citations, programmes, claims and open questions.

32 hits

OrganisationConfirmed1 Jul 2010 00:00 UTC

MAGIC

Medium Altitude Global ISR and Communications

USAF endurance-ISR programme. Air vehicle: Aurora Orion. Office: 645 AESG / BIG SAFARI — the same rapid-acquisition group that ran Gorgon Stare and took Blue Devil residuals. Confirmed as a multi-day ISR platform in that family. A specific MH370 operation is not established and is not ruled out.

OrganisationConfirmed15 Oct 2014

Lockheed Martin Compact Fusion Reactor

Public Skunk Works programme · Thomas McGuire · not an MH370 finding

Confirmed as a public Lockheed Skunk Works fusion project, discussed openly around 2014, with patents including US9947420 (magnetic-field plasma confinement; filing family 2 April 2014). Quiet Exodus treats it as the power core of a clandestine spacetime platform. That leap is the thesis, not the patent.

HypothesisOpen

A BIG SAFARI collection architecture around MH370

The family is documented. A specific 8 March operation is open.

Gorgon Stare, Blue Devil and MAGIC/Orion are one overlapping ISR family under 645 AESG / BIG SAFARI: same office, overlapping WAMI/SIGINT sensors, reusable GFE through Greenville, and a podded architecture meant to move between airframes. That family is confirmed. Whether any of it collected MH370 is not established and is not ruled out.

LocationConfirmed

Greenville, Texas

BIG SAFARI facility · Blue Devil II GFE available for other programmes

Q4 FY2012 destination of stopped Blue Devil II airship equipment, including government-furnished components. FY2014 USAF budget language: components available for other projects. Later inventory, including March 2014, is not published.

HypothesisUnverified

Asset denial of the Freescale team

Quiet Exodus thesis · not adopted as a finding

Hypothesis: the United States removed twenty Freescale employees from China’s reach, using a clandestine compact-fusion platform, because they were the programme’s irreplaceable integration unit. Headcount is confirmed. The programme-link, the intercept, and the 18:22 structural kill are not.

OrganisationConfirmed14 Mar 2011 00:00 UTC

Blue Devil I / II

Operational Block 1 WAAS + SIGINT · Block 2 residuals to BIG SAFARI

Block 1 was operational: manned aircraft carrying Angel Fire-derived wide-area imagery integrated with SIGINT. Block 2, the airship, was terminated — but its equipment, including GFE, was packed and sent to a BIG SAFARI facility in Greenville, Texas, available for other programmes. The technology did not vanish with the airship.

TimelineConfirmed23 May 2012 00:00 UTC

Blue Devil II stopped; hardware to Greenville

Payload stop 4 Jan 2012 · pack-out May 2012 · storage Q4 FY2012

Airship programme killed. Equipment packed and transferred to a BIG SAFARI-managed facility in Greenville, Texas. Components were available for other projects. Residual parts were later absorbed into other Air Force programmes.

ClaimConfirmed

Gorgon Stare, Blue Devil and MAGIC/Orion are one overlapping ISR family under BIG SAFARI

Confirmed by Congressional and USAF budget records. Same office, overlapping sensors (WAMI, SIGINT, airborne processing), shared GFE path through Greenville, and a podded architecture meant to move between airframes. Not isolated programmes that happen to share a decade.

DocumentOfficial finding18 Sep 2026 00:00 UTC

MH370 / US Military ISR Working Research Report v1

Working paper · 18 September 2026

Working paper on US military ISR programmes in the MH370 window: MAGIC, Orion, Gorgon Stare, Blue Devil and remote-control patents, read as one overlapping family under BIG SAFARI. The family is documented. A specific MH370 collection is not established and is not ruled out.

DocumentOfficial finding20 Sep 2026 00:00 UTC

MH370 Research Master Log

Investigation chronology · 18–20 September 2026

Running chronology of findings: cargo, 2011–2013 ISR programmes, radar disclosure on the westbound track, MAGIC budget exhibits, and the alleged-video file.

Open questionOpen

Where did Blue Devil residual components go?

Block 2 equipment, including government-furnished components, was packed and transferred to a BIG SAFARI-managed facility in Greenville, Texas, available for other projects. Residual parts were absorbed into other Air Force programmes. Later inventory — including March 2014 — is not published.

DocumentConfirmed19 Sep 2013 00:00 UTC

DODIG-2013-128 — Blue Devil Block 2

DoD Inspector General · 19 September 2013 · 54 pages · Drive source copy

Primary. FA8620-11-C-4024, ~$149m spent, payload stop 4 Jan 2012, residual components absorbed into other Air Force programmes.

DocumentConfirmed7 Jun 2013

HASC Report 113-102 — Gorgon Stare to recapitalise Blue Devil

House Armed Services Committee · 7 June 2013 · USD(I)/USAF report due 14 Feb 2014

Primary Congressional source: Gorgon Stare is the USAF’s only operational persistent day/night WAMI capability and the logical programme to recapitalise Blue Devil technologies, capabilities and lessons learned. Directed evolution into WAMI + near-vertical direction-finding SIGINT, leveraging Blue Devil PED. Report due 14 February 2014 — 22 days before MH370.

OrganisationConfirmed27 Apr 2009 00:00 UTC

ISIS

Integrated Sensor Is Structure · DARPA/USAF airship radar

Same PE as MAGIC. Lockheed integrator, Raytheon radar, ~$400–462m. Stratospheric airship with very large low-power radar. Confirmed programme; no evidence of MH370 collection.

EvidenceConfirmed19 May 2014

RegicideAnon satellite-video upload — 19 May 2014

Public upload date archivable; claimed 12 March receipt is not verified by that fact

Confirmed public-upload date. Description’s claimed ‘received 12 March 2014’ remains a separate, unverified field. Provenance of the file itself is still the core video question.

OrganisationConfirmed

USAF 303rd AESW

Named MAGIC transition organisation in OSD PB2012

OSD planned to provide MAGIC core technologies to the 303rd Aeronautical Systems Wing for further development of a deployable long-endurance UAS. Confirmed as a named office; later 645 AESG / BIG SAFARI execution is a separate fact.

OrganisationConfirmed

645 AESG / BIG SAFARI

USAF rapid acquisition — the office that binds this family

645 AESG / BIG SAFARI ran specialised rapid-development ISR. It executed MAGIC, developed Gorgon Stare, and took Blue Devil equipment into a facility it managed at Greenville, Texas. That is the documented organisational centre of this technology family, not a coincidence of names.

ClaimOpen

A specific MH370 collection event is not yet on the record — and is not ruled out

MAGIC/Orion, Gorgon Stare and Blue Devil form a documented overlapping family under BIG SAFARI. That family is not, by itself, a platform, sensor or sortie on 8 March 2014. The same material does not rule such a deployment out.

EvidenceUnverified18 Sep 2026

Blue Devil, MAGIC, Orion, BIG SAFARI — 2014 window

Briefing collages, 18 September 2026

Nic Moneypenny published investigation collages placing Blue Devil (including an egg-shaped airship), MAGIC, Aurora Orion, BIG SAFARI, Lockheed and DARPA in the same 2013–14 spending window as MH370, with Freescale’s last gyro presentation among the plates.

DocumentOfficial finding1 Dec 2016 00:00 UTC

DSTG Bayesian flight-path analysis

Defence Science and Technology Group, Australia

A probabilistic reconstruction of MH370’s path from SATCOM metadata. Output is a distribution along the 7th arc, not a pin in the map.

EvidenceUnverified18 Sep 2026

Freescale last presentation — gyroscopic sensors

Plate from the 18 September 2026 collage: pages of a Freescale presentation on gyroscopic sensors, identified as among the last formal materials before twenty employees boarded MH370.

OrganisationConfirmed1 Jul 2014 00:00 UTC

Gorgon Stare

BIG SAFARI wide-area surveillance · podded, not MQ-9-only

Developed through BIG SAFARI. Increment 2 is ARGUS-derived EO plus Exelis IR. Congress treated the podded/open architecture as integrable on more than one aircraft type. MQ-9 is the documented host; an Orion fit by 8 March 2014 is open. 2013 OSD figure: 2 fps, not 6.

HypothesisOpen

Interstate politics — China, Russia, Iran

Manifest geography is not a state-act finding

Destination Beijing, Chinese majority, Iranian stolen-passport travellers, one Russian national. Facts of who was on board. Not a finding of PLA, FSB, or IRGC action.

TimelineConfirmed17 Aug 2011

L-3 Greenville awarded Blue Devil 2 integration / test

FA8620-06-G-4003 / order 1157 · $12.054m · 17 Aug 2011

L-3 Communications Integrated Systems, Greenville, Texas, paid for BD2 airship integration and test support. Later Q4 FY2012 storage was also at a 645 AESG-managed Greenville facility. Geographic coincidence is not a custody finding.

ClaimConfirmed

MAGIC/Orion continued in USAF development after 2014

Confirmed by PB2020. Congressional adds through FY2018. The ‘faded after 2014’ formulation is a correction, not a secrecy finding.

DocumentConfirmed18 Sep 2026 22:50 UTC

MH370 Daily Research — working papers

18 September 2026

Working ISR report, source ledger and master chronology gathered the same day, with a cited-URL set pointing at contemporary MAGIC, Orion and Gorgon Stare reporting.

ClaimUnverified6 Dec 2025

Michael Selig testimony — Diego Garcia, Gorgon Stare, cold plasma

Nic Moneypenny notes a written and recorded account by Michael Selig, former fast-jet pilot who flew into Diego Garcia, describing an MH370 end-state, a leaked video, Gorgon Stare and scalar / plasma language.

TimelineConfirmed24 Aug 2013 00:00 UTC

Orion first flight, China Lake

24 August 2013 · ~3.5 hours · 8,000 ft · no mission payload

Remote launch from GCS. Air vehicle and command link demonstrated. ISR stack not yet fitted.

TimelineConfirmed15 Dec 2014

Orion flight 18 — 80-hour record with 1,000 lb ballast

December 2014 · not an ISR-payload demonstration

Aurora’s endurance attempt was flight 18 and carried 1,000 lb of ballast. Maiden flight (no mission system) and this record flight both fail as evidence of an operational ISR stack. Payload on flights 2–17 remains open.

ClaimConfirmed

Orion’s first flight carried no mission system

Confirmed by contemporary September 2013 reporting and consistent with PB2015’s FY2014 “best of breed” sensor-selection language. December 2014 endurance attempt was flight 18 with 1,000 lb ballast — also not an ISR-payload demonstration. Those two flights do not decide what Orion was, and they do not decide March 2014.

DocumentUnverified1 Jan 2026

Project Quiet Exodus — Part 1

SecretMilitaryTechnology.com thesis · asset denial of the Freescale team

A long-form thesis that MH370 was a US operation to stop twenty Freescale employees reaching China, protecting a compact-fusion / spacetime platform. Public facts inside it (headcount, Carlyle, Lockheed CFR patents, HA08 outage, UCT-2 at Diego Garcia) are filed separately. The operation itself is not established.

EvidenceOpen20 Sep 2026

Remote-control claims versus evidence gaps

Patent, QF-16, Teso FMS proof-of-concept · installation on 9M-MRO still open

Working chart: unmanned flight of a fighter-class jet was demonstrated in 2013; Boeing’s uninterruptible-autopilot patent exists; Hugo Teso showed an FMS proof-of-concept the same year. Boeing told Malaysian investigators there was no commercial implementation on the 2002 delivery. Radar proves a turn at IGARI, not who commanded it. Ten data requests remain.

273 records in the file.