Resources
Resources
Official papers, films, Wikipedia and its citations, programmes, claims and open questions.
52 hits
Gorgon Stare, Blue Devil and MAGIC/Orion are one overlapping ISR family under BIG SAFARI
Confirmed by Congressional and USAF budget records. Same office, overlapping sensors (WAMI, SIGINT, airborne processing), shared GFE path through Greenville, and a podded architecture meant to move between airframes. Not isolated programmes that happen to share a decade.
MAGIC
Medium Altitude Global ISR and Communications
USAF endurance-ISR programme. Air vehicle: Aurora Orion. Office: 645 AESG / BIG SAFARI — the same rapid-acquisition group that ran Gorgon Stare and took Blue Devil residuals. Confirmed as a multi-day ISR platform in that family. A specific MH370 operation is not established and is not ruled out.
USAF PB2020 — MAGIC/Orion continued after 2014
PE 0305205F · Congressional adds FY2015–FY2018
MAGIC/Orion did not fade from the budget after 2014. Adds: $20m FY2015, $5m FY2016, $50m FY2017, $40m FY2018, on top of $19m FY2012 and $50m FY2013. Post-2016 money was for airworthiness, cybersecurity, interoperability and mission capability toward a deployable Block 1 Orion.
645 AESG / BIG SAFARI
USAF rapid acquisition — the office that binds this family
645 AESG / BIG SAFARI ran specialised rapid-development ISR. It executed MAGIC, developed Gorgon Stare, and took Blue Devil equipment into a facility it managed at Greenville, Texas. That is the documented organisational centre of this technology family, not a coincidence of names.
OSD PB2012 — MAGIC JCTD primary record
PE 0603648D8Z · pp. 32–33 · USCENTCOM sponsor
Primary OSD budget exhibit: MAGIC is a USCENTCOM-sponsored JCTD. 120-hour sortie, nominal 1,000 lb / maximum 2,600 lb at 15,000 ft. Modular payload classes: EO/IR, SIGINT, GMTI, wide-area surveillance, communications relay, strike. Transition named to USAF 303rd AESW.
Blue Devil, MAGIC, Orion, BIG SAFARI — 2014 window
Briefing collages, 18 September 2026
Nic Moneypenny published investigation collages placing Blue Devil (including an egg-shaped airship), MAGIC, Aurora Orion, BIG SAFARI, Lockheed and DARPA in the same 2013–14 spending window as MH370, with Freescale’s last gyro presentation among the plates.
MAGIC, Aurora and Boeing/NRL patents drop from the paper trail in 2014
Follow-up briefing: Aurora’s remote-operation work for the US military from about 2010; MAGIC and several Boeing and NRL patents then become hard to find in open documents in 2014. Redacted Blue Devil letters are shown with matching date cut-offs.
Aurora Orion contract FA8620-12-C-3027
~$86.56m aggregated · completion extending to 2019
Public award aggregation for the BIG SAFARI / Orion definitive contract. Transaction-level FPDS history — especially modifications August 2013–March 2014 — is still open. Budget authority, ceilings and obligations are not the same as cash spent.
Aurora Orion RPA
Twin-diesel MALE UAS · China Lake first flight 24 Aug 2013
Selected air vehicle for MAGIC: a multi-day, medium-altitude remotely piloted ISR platform designed to carry multiple sensors. First flight (24 Aug 2013) had no mission system; the December 2014 endurance record carried ballast. Those two flights do not decide what was fitted on sorties 2–17, including March 2014.
MAGIC/Orion continued in USAF development after 2014
Confirmed by PB2020. Congressional adds through FY2018. The ‘faded after 2014’ formulation is a correction, not a secrecy finding.
Business Case Analysis of MAGIC UAV System
Naval Postgraduate School thesis · public PDF
Academic model of MAGIC as long-range ISR, not a named communications-relay payload. The $510m RDT&E figure in the thesis is an academic model, not an official acquisition estimate.
MAGIC JCTD initiated
FY2010 Q3 · OSD/DDR&E
Competition among five defence-industry partners. $5m initial to AFRL. CENTCOM persistent-ISR sponsorship in Aurora’s 2010 release.
MAGIC was designed for multi-INT payload modularity, not only endurance
OSD PB2012 lists EO/IR, SIGINT, GMTI, wide-area surveillance, communications relay and strike as modular payload classes, plus reduced-manning / open-architecture avionics. That is the documented architecture. It is not an installed-GFE list for March 2014.
What sensors were actually on Orion by March 2014?
Orion was selected as MAGIC’s multi-day, multi-sensor ISR aircraft. First flight had no mission system; flight 18 (Dec 2014) carried ballast. Those two points do not empty the aircraft. Sorties 2–17, including March 2014, are the hole. Gorgon Stare / MTS-B / VADER remain live leads, not closed fits.
Aurora Flight Sciences
HALE/MALE autonomy house · Orion prime
Founded 1989. Chiron optionally piloted aircraft 1996. Global Hawk structures since 1995. Centaur optionally piloted DA42 from 2010. AACUS autonomous helicopter demo February 2014. ALIAS is later drop-in copilot work.
Orion first flight, China Lake
24 August 2013 · ~3.5 hours · 8,000 ft · no mission payload
Remote launch from GCS. Air vehicle and command link demonstrated. ISR stack not yet fitted.
Orion 123-hour engine bench test
January 2012 · Manassas, Virginia
Propulsion endurance exceeded the 120-hour flight objective on the ground rig before the airframe flew.
Orion’s first flight carried no mission system
Confirmed by contemporary September 2013 reporting and consistent with PB2015’s FY2014 “best of breed” sensor-selection language. December 2014 endurance attempt was flight 18 with 1,000 lb ballast — also not an ISR-payload demonstration. Those two flights do not decide what Orion was, and they do not decide March 2014.
Orion flight 18 — 80-hour record with 1,000 lb ballast
December 2014 · not an ISR-payload demonstration
Aurora’s endurance attempt was flight 18 and carried 1,000 lb of ballast. Maiden flight (no mission system) and this record flight both fail as evidence of an operational ISR stack. Payload on flights 2–17 remains open.
A BIG SAFARI collection architecture around MH370
The family is documented. A specific 8 March operation is open.
Gorgon Stare, Blue Devil and MAGIC/Orion are one overlapping ISR family under 645 AESG / BIG SAFARI: same office, overlapping WAMI/SIGINT sensors, reusable GFE through Greenville, and a podded architecture meant to move between airframes. That family is confirmed. Whether any of it collected MH370 is not established and is not ruled out.
Orion 80-hour remotely controlled flight
December 2014 · 1,000 lb ballast · fuel for ~37 more hours
Contractor-confirmed endurance after MH370. This was flight 18 and carried 1,000 lb of ballast. Shows the air vehicle matured; does not rewind payload status to March.
What was on Orion flights 2–17 between August 2013 and March 2014?
First flight: no mission system. Flight 18 (Dec 2014): ballast. The MH370-relevant interval is the unlisted sorties in between, plus whether the ‘second flight series’ PB2015 said was being scheduled had begun by 8 March.
What were the two MAGIC JUON numbers and the FY2012/13 add sponsors?
USAF says two Joint Urgent Operational Needs for long dwell / persistent ISR. Exact numbers, submitting commands, and the $19m / $50m Congressional language are unresolved.
Gorgon Stare
BIG SAFARI wide-area surveillance · podded, not MQ-9-only
Developed through BIG SAFARI. Increment 2 is ARGUS-derived EO plus Exelis IR. Congress treated the podded/open architecture as integrable on more than one aircraft type. MQ-9 is the documented host; an Orion fit by 8 March 2014 is open. 2013 OSD figure: 2 fps, not 6.
USAF 303rd AESW
Named MAGIC transition organisation in OSD PB2012
OSD planned to provide MAGIC core technologies to the 303rd Aeronautical Systems Wing for further development of a deployable long-endurance UAS. Confirmed as a named office; later 645 AESG / BIG SAFARI execution is a separate fact.
Blue Devil I / II
Operational Block 1 WAAS + SIGINT · Block 2 residuals to BIG SAFARI
Block 1 was operational: manned aircraft carrying Angel Fire-derived wide-area imagery integrated with SIGINT. Block 2, the airship, was terminated — but its equipment, including GFE, was packed and sent to a BIG SAFARI facility in Greenville, Texas, available for other programmes. The technology did not vanish with the airship.
Raytheon MTS-B as Orion payload lead
Reported option · 2012–13 USAF UAV MTS bookings in the $200m class
MTS-B is EO/IR FMV/targeting. Aviation Week 2010 attributed a planned pair of MTS-B turrets on Orion — planned, not fitted on the maiden article. Flight 18 (Dec 2014) carried 1,000 lb ballast. Raytheon 10-K totals do not identify Orion as the customer.
A specific MH370 collection event is not yet on the record — and is not ruled out
MAGIC/Orion, Gorgon Stare and Blue Devil form a documented overlapping family under BIG SAFARI. That family is not, by itself, a platform, sensor or sortie on 8 March 2014. The same material does not rule such a deployment out.
Greenville, Texas
BIG SAFARI facility · Blue Devil II GFE available for other programmes
Q4 FY2012 destination of stopped Blue Devil II airship equipment, including government-furnished components. FY2014 USAF budget language: components available for other projects. Later inventory, including March 2014, is not published.
NAWS China Lake
Orion first flight · 24 August 2013
US Navy air weapons station in California. Orion and GCS shipped here July 2013.
Gorgon Stare’s podded architecture was designed for more than MQ-9
HASC 113-102: open/podded architecture permitted integration on multiple aircraft types. Aviation Week 2010 named it as a potential MAGIC payload. An Orion installation by 8 March 2014 is not shown.
Blue Devil II stopped; hardware to Greenville
Payload stop 4 Jan 2012 · pack-out May 2012 · storage Q4 FY2012
Airship programme killed. Equipment packed and transferred to a BIG SAFARI-managed facility in Greenville, Texas. Components were available for other projects. Residual parts were later absorbed into other Air Force programmes.
FY2013 Endurance UAV budget jumped via Congressional adds, not a hidden presidential request
PE 0305205F: previous PB $21m → $74.126m. MAGIC $50m add; Endurance UAV Base $9.893m. Documented. Who sponsored the add remains open.
MH370 Daily Research — working papers
18 September 2026
Working ISR report, source ledger and master chronology gathered the same day, with a cited-URL set pointing at contemporary MAGIC, Orion and Gorgon Stare reporting.
MH370 / US Military ISR Working Research Report v1
Working paper · 18 September 2026
Working paper on US military ISR programmes in the MH370 window: MAGIC, Orion, Gorgon Stare, Blue Devil and remote-control patents, read as one overlapping family under BIG SAFARI. The family is documented. A specific MH370 collection is not established and is not ruled out.
Raytheon Space and Airborne Systems
ISIS radar · MTS for USAF UAVs · large classified SAS bookings
Radar on ISIS; MTS-B is an Orion payload lead. 2013 SAS booked $210m MTS for USAF UAVs and $862m classified. Those totals do not establish an MH370/MAGIC contract.
What is the bridge from the ISR family to MH370?
Gorgon Stare, Blue Devil and MAGIC/Orion are a documented family under BIG SAFARI. The open question is one specific platform, sensor, command link, contract, deployment or test event in both that family and the MH370 window. Until that object is found, involvement is not established — and is not ruled out.
FIRST RF Phase II — dual-band UHF/X-band airborne SAR
FA8650-11-C-1016 · $749,593 · start 26 Jan 2011 · topic AF093-138
Official SBIR: lightweight dual-band UHF/X-band SAR on a modified Artemis COTS radar plus FIRST RF single-aperture antenna. SWaP ~20 lb / 150 W. Design target included Shadow 200. A concrete alternative to treating Orion as the unnamed FY2013 RF Persistent Sensing platform.
ISIS
Integrated Sensor Is Structure · DARPA/USAF airship radar
Same PE as MAGIC. Lockheed integrator, Raytheon radar, ~$400–462m. Stratospheric airship with very large low-power radar. Confirmed programme; no evidence of MH370 collection.
MH370 Research Master Log
Investigation chronology · 18–20 September 2026
Running chronology of findings: cargo, 2011–2013 ISR programmes, radar disclosure on the westbound track, MAGIC budget exhibits, and the alleged-video file.
Where did Blue Devil residual components go?
Block 2 equipment, including government-furnished components, was packed and transferred to a BIG SAFARI-managed facility in Greenville, Texas, available for other projects. Residual parts were absorbed into other Air Force programmes. Later inventory — including March 2014 — is not published.
Where was the Blue Devil I government-owned sensor package in January–March 2014?
Aircraft gone; sensors remaining as government property, being assessed for reassignment. Destination on 8 March is open — including Orion, MQ-9, MC-12, or another host. Not shown, and not ruled out.
Lockheed awarded ISIS Phase 3
27 April 2009 · just under $400m
Lockheed integrator, Raytheon radar, one-third-scale autonomous airship. Same later PE as MAGIC.
What platform received the FY2013 dual-band RF Persistent Sensing integration?
PB2015: completed and integrated onto an ‘identified platform,’ then the effort ended. Public exhibits do not name it. FIRST RF / Shadow 200 and ISIS test-facility work are documented UHF/X-band alternatives. Orion is chronology-only.
Alleged thermal / wide-area video is authentic collection
Hypothesis to test — provenance not established
Circulating clips are treated as alleged. If genuine, at least one collector must satisfy geometry, band, FOV, altitude and comms. Platform IDs attached to social posts are not accepted as authority. A ~6 fps ‘Gorgon Stare Increment 2 match’ is contradicted by the 2013 OSD 2 fps figure.
Angel Fire
Wide-area airborne surveillance · lineage into Blue Devil Block 1
USAF/SOCOM WAAS system. Congressional documentation describes Blue Devil Block 1 as integrating Angel Fire-derived wide-area imagery with signals intelligence on manned aircraft. Confirmed as the WAAS ancestor in this family, not as an MH370 collector.
Boeing–NAVAIR delivery order signed 4 March 2014
$955,853.54 · N0001914D0012 · engineering/technical support · St Louis

Confirmed public contracting record, four days before MH370. Department of the Navy, Naval Air Systems Command, NAICS aircraft manufacturing, PSC R425 professional engineering/technical support. Subject of the order is not in the public header. Chronology is not a collection event.
FY2013 NDAA Sec. 927 — integrated SIGINT / WAMI plan
Congressional Record 12 Dec 2012 · ISR Task Force plan due 1 Jan 2013
Statute required a plan for operationally integrated SIGINT able to detect, track and precisely geolocate high-band devices and immediately cue imagery. Named Army Guardrail / ARGUS A160, USAF Blue Moon QRC and DARPA WAND. Consult NSA and USSOCOM.
Kadena P-3C tasked to the MH370 search
Announced 8 March 2014 · on station 9 March
Confirmed search tasking. Seventh Fleet said a P-3C would leave Kadena Air Base, Okinawa, shortly on 8 March. Naval Today: the P-3 arrived on station the afternoon of 9 March. VP-16 P-8A Poseidon had been in theatre from December 2013 — basing, not a 7–9 March sortie card.
Raytheon MTS award for HC/MC-130J — one day before MH370
$10.072556m · 10 systems · 7 March 2014
Chronology fact only. No evidence these turrets or aircraft observed MH370. HD-capable MTS-B was entering USAF inventory through 2013–14.
Twenty Freescale employees on MH370
Company-confirmed 8 March 2014
Confirmed passenger fact. Project assignments, especially defence/avionics/inertial work, are unresolved. FXAS21000 gyro sampling in July 2013 is an adjacent product date only.
Was Gorgon Stare Increment 2 operational on 8 March 2014?
Sierra Nevada (1 Jul 2014): deployed to Afghanistan ‘earlier this year’ and at IOC. Air & Space Forces (7 Apr 2014): Col Brandon Baker — second iteration ‘has been tried operationally’ and would undergo a six-month evaluation. Mercury SEC: 18-month QRC delivery from a 2011 win. None of these pin 7–8 March.
273 records in the file.