Skip to content

Resources

Resources

Official papers, films, Wikipedia and its citations, programmes, claims and open questions.

52 hits

ClaimConfirmed

Gorgon Stare, Blue Devil and MAGIC/Orion are one overlapping ISR family under BIG SAFARI

Confirmed by Congressional and USAF budget records. Same office, overlapping sensors (WAMI, SIGINT, airborne processing), shared GFE path through Greenville, and a podded architecture meant to move between airframes. Not isolated programmes that happen to share a decade.

OrganisationConfirmed1 Jul 2010 00:00 UTC

MAGIC

Medium Altitude Global ISR and Communications

USAF endurance-ISR programme. Air vehicle: Aurora Orion. Office: 645 AESG / BIG SAFARI — the same rapid-acquisition group that ran Gorgon Stare and took Blue Devil residuals. Confirmed as a multi-day ISR platform in that family. A specific MH370 operation is not established and is not ruled out.

DocumentConfirmed1 Mar 2019

USAF PB2020 — MAGIC/Orion continued after 2014

PE 0305205F · Congressional adds FY2015–FY2018

MAGIC/Orion did not fade from the budget after 2014. Adds: $20m FY2015, $5m FY2016, $50m FY2017, $40m FY2018, on top of $19m FY2012 and $50m FY2013. Post-2016 money was for airworthiness, cybersecurity, interoperability and mission capability toward a deployable Block 1 Orion.

OrganisationConfirmed

645 AESG / BIG SAFARI

USAF rapid acquisition — the office that binds this family

645 AESG / BIG SAFARI ran specialised rapid-development ISR. It executed MAGIC, developed Gorgon Stare, and took Blue Devil equipment into a facility it managed at Greenville, Texas. That is the documented organisational centre of this technology family, not a coincidence of names.

DocumentConfirmed1 Feb 2011

OSD PB2012 — MAGIC JCTD primary record

PE 0603648D8Z · pp. 32–33 · USCENTCOM sponsor

Primary OSD budget exhibit: MAGIC is a USCENTCOM-sponsored JCTD. 120-hour sortie, nominal 1,000 lb / maximum 2,600 lb at 15,000 ft. Modular payload classes: EO/IR, SIGINT, GMTI, wide-area surveillance, communications relay, strike. Transition named to USAF 303rd AESW.

EvidenceUnverified18 Sep 2026

Blue Devil, MAGIC, Orion, BIG SAFARI — 2014 window

Briefing collages, 18 September 2026

Nic Moneypenny published investigation collages placing Blue Devil (including an egg-shaped airship), MAGIC, Aurora Orion, BIG SAFARI, Lockheed and DARPA in the same 2013–14 spending window as MH370, with Freescale’s last gyro presentation among the plates.

ClaimUnverified18 Sep 2026

MAGIC, Aurora and Boeing/NRL patents drop from the paper trail in 2014

Follow-up briefing: Aurora’s remote-operation work for the US military from about 2010; MAGIC and several Boeing and NRL patents then become hard to find in open documents in 2014. Redacted Blue Devil letters are shown with matching date cut-offs.

EvidenceProbable1 Jan 2012

Aurora Orion contract FA8620-12-C-3027

~$86.56m aggregated · completion extending to 2019

Public award aggregation for the BIG SAFARI / Orion definitive contract. Transaction-level FPDS history — especially modifications August 2013–March 2014 — is still open. Budget authority, ceilings and obligations are not the same as cash spent.

OrganisationConfirmed24 Aug 2013 00:00 UTC

Aurora Orion RPA

Twin-diesel MALE UAS · China Lake first flight 24 Aug 2013

Selected air vehicle for MAGIC: a multi-day, medium-altitude remotely piloted ISR platform designed to carry multiple sensors. First flight (24 Aug 2013) had no mission system; the December 2014 endurance record carried ballast. Those two flights do not decide what was fitted on sorties 2–17, including March 2014.

ClaimConfirmed

MAGIC/Orion continued in USAF development after 2014

Confirmed by PB2020. Congressional adds through FY2018. The ‘faded after 2014’ formulation is a correction, not a secrecy finding.

DocumentConfirmed1 Jan 2012 00:00 UTC

Business Case Analysis of MAGIC UAV System

Naval Postgraduate School thesis · public PDF

Academic model of MAGIC as long-range ISR, not a named communications-relay payload. The $510m RDT&E figure in the thesis is an academic model, not an official acquisition estimate.

TimelineConfirmed1 Jul 2010 00:00 UTC

MAGIC JCTD initiated

FY2010 Q3 · OSD/DDR&E

Competition among five defence-industry partners. $5m initial to AFRL. CENTCOM persistent-ISR sponsorship in Aurora’s 2010 release.

ClaimConfirmed

MAGIC was designed for multi-INT payload modularity, not only endurance

OSD PB2012 lists EO/IR, SIGINT, GMTI, wide-area surveillance, communications relay and strike as modular payload classes, plus reduced-manning / open-architecture avionics. That is the documented architecture. It is not an installed-GFE list for March 2014.

Open questionOpen

What sensors were actually on Orion by March 2014?

Orion was selected as MAGIC’s multi-day, multi-sensor ISR aircraft. First flight had no mission system; flight 18 (Dec 2014) carried ballast. Those two points do not empty the aircraft. Sorties 2–17, including March 2014, are the hole. Gorgon Stare / MTS-B / VADER remain live leads, not closed fits.

OrganisationConfirmed

Aurora Flight Sciences

HALE/MALE autonomy house · Orion prime

Founded 1989. Chiron optionally piloted aircraft 1996. Global Hawk structures since 1995. Centaur optionally piloted DA42 from 2010. AACUS autonomous helicopter demo February 2014. ALIAS is later drop-in copilot work.

TimelineConfirmed24 Aug 2013 00:00 UTC

Orion first flight, China Lake

24 August 2013 · ~3.5 hours · 8,000 ft · no mission payload

Remote launch from GCS. Air vehicle and command link demonstrated. ISR stack not yet fitted.

TimelineConfirmed28 Jan 2012 00:00 UTC

Orion 123-hour engine bench test

January 2012 · Manassas, Virginia

Propulsion endurance exceeded the 120-hour flight objective on the ground rig before the airframe flew.

ClaimConfirmed

Orion’s first flight carried no mission system

Confirmed by contemporary September 2013 reporting and consistent with PB2015’s FY2014 “best of breed” sensor-selection language. December 2014 endurance attempt was flight 18 with 1,000 lb ballast — also not an ISR-payload demonstration. Those two flights do not decide what Orion was, and they do not decide March 2014.

TimelineConfirmed15 Dec 2014

Orion flight 18 — 80-hour record with 1,000 lb ballast

December 2014 · not an ISR-payload demonstration

Aurora’s endurance attempt was flight 18 and carried 1,000 lb of ballast. Maiden flight (no mission system) and this record flight both fail as evidence of an operational ISR stack. Payload on flights 2–17 remains open.

HypothesisOpen

A BIG SAFARI collection architecture around MH370

The family is documented. A specific 8 March operation is open.

Gorgon Stare, Blue Devil and MAGIC/Orion are one overlapping ISR family under 645 AESG / BIG SAFARI: same office, overlapping WAMI/SIGINT sensors, reusable GFE through Greenville, and a podded architecture meant to move between airframes. That family is confirmed. Whether any of it collected MH370 is not established and is not ruled out.

TimelineConfirmed15 Dec 2014 00:00 UTC

Orion 80-hour remotely controlled flight

December 2014 · 1,000 lb ballast · fuel for ~37 more hours

Contractor-confirmed endurance after MH370. This was flight 18 and carried 1,000 lb of ballast. Shows the air vehicle matured; does not rewind payload status to March.

Open questionOpen

What was on Orion flights 2–17 between August 2013 and March 2014?

First flight: no mission system. Flight 18 (Dec 2014): ballast. The MH370-relevant interval is the unlisted sorties in between, plus whether the ‘second flight series’ PB2015 said was being scheduled had begun by 8 March.

Open questionOpen

What were the two MAGIC JUON numbers and the FY2012/13 add sponsors?

USAF says two Joint Urgent Operational Needs for long dwell / persistent ISR. Exact numbers, submitting commands, and the $19m / $50m Congressional language are unresolved.

OrganisationConfirmed1 Jul 2014 00:00 UTC

Gorgon Stare

BIG SAFARI wide-area surveillance · podded, not MQ-9-only

Developed through BIG SAFARI. Increment 2 is ARGUS-derived EO plus Exelis IR. Congress treated the podded/open architecture as integrable on more than one aircraft type. MQ-9 is the documented host; an Orion fit by 8 March 2014 is open. 2013 OSD figure: 2 fps, not 6.

OrganisationConfirmed

USAF 303rd AESW

Named MAGIC transition organisation in OSD PB2012

OSD planned to provide MAGIC core technologies to the 303rd Aeronautical Systems Wing for further development of a deployable long-endurance UAS. Confirmed as a named office; later 645 AESG / BIG SAFARI execution is a separate fact.

OrganisationConfirmed14 Mar 2011 00:00 UTC

Blue Devil I / II

Operational Block 1 WAAS + SIGINT · Block 2 residuals to BIG SAFARI

Block 1 was operational: manned aircraft carrying Angel Fire-derived wide-area imagery integrated with SIGINT. Block 2, the airship, was terminated — but its equipment, including GFE, was packed and sent to a BIG SAFARI facility in Greenville, Texas, available for other programmes. The technology did not vanish with the airship.

EvidenceUnverified

Raytheon MTS-B as Orion payload lead

Reported option · 2012–13 USAF UAV MTS bookings in the $200m class

MTS-B is EO/IR FMV/targeting. Aviation Week 2010 attributed a planned pair of MTS-B turrets on Orion — planned, not fitted on the maiden article. Flight 18 (Dec 2014) carried 1,000 lb ballast. Raytheon 10-K totals do not identify Orion as the customer.

ClaimOpen

A specific MH370 collection event is not yet on the record — and is not ruled out

MAGIC/Orion, Gorgon Stare and Blue Devil form a documented overlapping family under BIG SAFARI. That family is not, by itself, a platform, sensor or sortie on 8 March 2014. The same material does not rule such a deployment out.

LocationConfirmed

Greenville, Texas

BIG SAFARI facility · Blue Devil II GFE available for other programmes

Q4 FY2012 destination of stopped Blue Devil II airship equipment, including government-furnished components. FY2014 USAF budget language: components available for other projects. Later inventory, including March 2014, is not published.

LocationConfirmed

NAWS China Lake

Orion first flight · 24 August 2013

US Navy air weapons station in California. Orion and GCS shipped here July 2013.

ClaimConfirmed

Gorgon Stare’s podded architecture was designed for more than MQ-9

HASC 113-102: open/podded architecture permitted integration on multiple aircraft types. Aviation Week 2010 named it as a potential MAGIC payload. An Orion installation by 8 March 2014 is not shown.

TimelineConfirmed23 May 2012 00:00 UTC

Blue Devil II stopped; hardware to Greenville

Payload stop 4 Jan 2012 · pack-out May 2012 · storage Q4 FY2012

Airship programme killed. Equipment packed and transferred to a BIG SAFARI-managed facility in Greenville, Texas. Components were available for other projects. Residual parts were later absorbed into other Air Force programmes.

ClaimConfirmed

FY2013 Endurance UAV budget jumped via Congressional adds, not a hidden presidential request

PE 0305205F: previous PB $21m → $74.126m. MAGIC $50m add; Endurance UAV Base $9.893m. Documented. Who sponsored the add remains open.

DocumentConfirmed18 Sep 2026 22:50 UTC

MH370 Daily Research — working papers

18 September 2026

Working ISR report, source ledger and master chronology gathered the same day, with a cited-URL set pointing at contemporary MAGIC, Orion and Gorgon Stare reporting.

DocumentOfficial finding18 Sep 2026 00:00 UTC

MH370 / US Military ISR Working Research Report v1

Working paper · 18 September 2026

Working paper on US military ISR programmes in the MH370 window: MAGIC, Orion, Gorgon Stare, Blue Devil and remote-control patents, read as one overlapping family under BIG SAFARI. The family is documented. A specific MH370 collection is not established and is not ruled out.

OrganisationConfirmed

Raytheon Space and Airborne Systems

ISIS radar · MTS for USAF UAVs · large classified SAS bookings

Radar on ISIS; MTS-B is an Orion payload lead. 2013 SAS booked $210m MTS for USAF UAVs and $862m classified. Those totals do not establish an MH370/MAGIC contract.

Open questionOpen

What is the bridge from the ISR family to MH370?

Gorgon Stare, Blue Devil and MAGIC/Orion are a documented family under BIG SAFARI. The open question is one specific platform, sensor, command link, contract, deployment or test event in both that family and the MH370 window. Until that object is found, involvement is not established — and is not ruled out.

DocumentConfirmed26 Jan 2011

FIRST RF Phase II — dual-band UHF/X-band airborne SAR

FA8650-11-C-1016 · $749,593 · start 26 Jan 2011 · topic AF093-138

Official SBIR: lightweight dual-band UHF/X-band SAR on a modified Artemis COTS radar plus FIRST RF single-aperture antenna. SWaP ~20 lb / 150 W. Design target included Shadow 200. A concrete alternative to treating Orion as the unnamed FY2013 RF Persistent Sensing platform.

OrganisationConfirmed27 Apr 2009 00:00 UTC

ISIS

Integrated Sensor Is Structure · DARPA/USAF airship radar

Same PE as MAGIC. Lockheed integrator, Raytheon radar, ~$400–462m. Stratospheric airship with very large low-power radar. Confirmed programme; no evidence of MH370 collection.

DocumentOfficial finding20 Sep 2026 00:00 UTC

MH370 Research Master Log

Investigation chronology · 18–20 September 2026

Running chronology of findings: cargo, 2011–2013 ISR programmes, radar disclosure on the westbound track, MAGIC budget exhibits, and the alleged-video file.

Open questionOpen

Where did Blue Devil residual components go?

Block 2 equipment, including government-furnished components, was packed and transferred to a BIG SAFARI-managed facility in Greenville, Texas, available for other projects. Residual parts were absorbed into other Air Force programmes. Later inventory — including March 2014 — is not published.

Open questionOpen

Where was the Blue Devil I government-owned sensor package in January–March 2014?

Aircraft gone; sensors remaining as government property, being assessed for reassignment. Destination on 8 March is open — including Orion, MQ-9, MC-12, or another host. Not shown, and not ruled out.

TimelineConfirmed27 Apr 2009 00:00 UTC

Lockheed awarded ISIS Phase 3

27 April 2009 · just under $400m

Lockheed integrator, Raytheon radar, one-third-scale autonomous airship. Same later PE as MAGIC.

Open questionOpen

What platform received the FY2013 dual-band RF Persistent Sensing integration?

PB2015: completed and integrated onto an ‘identified platform,’ then the effort ended. Public exhibits do not name it. FIRST RF / Shadow 200 and ISIS test-facility work are documented UHF/X-band alternatives. Orion is chronology-only.

HypothesisUnverified

Alleged thermal / wide-area video is authentic collection

Hypothesis to test — provenance not established

Circulating clips are treated as alleged. If genuine, at least one collector must satisfy geometry, band, FOV, altitude and comms. Platform IDs attached to social posts are not accepted as authority. A ~6 fps ‘Gorgon Stare Increment 2 match’ is contradicted by the 2013 OSD 2 fps figure.

OrganisationConfirmed

Angel Fire

Wide-area airborne surveillance · lineage into Blue Devil Block 1

USAF/SOCOM WAAS system. Congressional documentation describes Blue Devil Block 1 as integrating Angel Fire-derived wide-area imagery with signals intelligence on manned aircraft. Confirmed as the WAAS ancestor in this family, not as an MH370 collector.

EvidenceConfirmed4 Mar 2014

Boeing–NAVAIR delivery order signed 4 March 2014

$955,853.54 · N0001914D0012 · engineering/technical support · St Louis

Confirmed public contracting record, four days before MH370. Department of the Navy, Naval Air Systems Command, NAICS aircraft manufacturing, PSC R425 professional engineering/technical support. Subject of the order is not in the public header. Chronology is not a collection event.

DocumentConfirmed12 Dec 2012

FY2013 NDAA Sec. 927 — integrated SIGINT / WAMI plan

Congressional Record 12 Dec 2012 · ISR Task Force plan due 1 Jan 2013

Statute required a plan for operationally integrated SIGINT able to detect, track and precisely geolocate high-band devices and immediately cue imagery. Named Army Guardrail / ARGUS A160, USAF Blue Moon QRC and DARPA WAND. Consult NSA and USSOCOM.

TimelineConfirmed8 Mar 2014

Kadena P-3C tasked to the MH370 search

Announced 8 March 2014 · on station 9 March

Confirmed search tasking. Seventh Fleet said a P-3C would leave Kadena Air Base, Okinawa, shortly on 8 March. Naval Today: the P-3 arrived on station the afternoon of 9 March. VP-16 P-8A Poseidon had been in theatre from December 2013 — basing, not a 7–9 March sortie card.

TimelineConfirmed7 Mar 2014

Raytheon MTS award for HC/MC-130J — one day before MH370

$10.072556m · 10 systems · 7 March 2014

Chronology fact only. No evidence these turrets or aircraft observed MH370. HD-capable MTS-B was entering USAF inventory through 2013–14.

EvidenceConfirmed8 Mar 2014 00:00 UTC

Twenty Freescale employees on MH370

Company-confirmed 8 March 2014

Confirmed passenger fact. Project assignments, especially defence/avionics/inertial work, are unresolved. FXAS21000 gyro sampling in July 2013 is an adjacent product date only.

Open questionOpen

Was Gorgon Stare Increment 2 operational on 8 March 2014?

Sierra Nevada (1 Jul 2014): deployed to Afghanistan ‘earlier this year’ and at IOC. Air & Space Forces (7 Apr 2014): Col Brandon Baker — second iteration ‘has been tried operationally’ and would undergo a six-month evaluation. Mercury SEC: 18-month QRC delivery from a 2011 win. None of these pin 7–8 March.

273 records in the file.