Skip to content

Resources

Resources

Official papers, films, Wikipedia and its citations, programmes, claims and open questions.

60 hits

Open questionOpen

Where was the Blue Devil I government-owned sensor package in January–March 2014?

Aircraft gone; sensors remaining as government property, being assessed for reassignment. Destination on 8 March is open — including Orion, MQ-9, MC-12, or another host. Not shown, and not ruled out.

Open questionOpen

Could the Inmarsat BFO have been spoofed?

Wise’s northern path stands or falls on this. Inmarsat and ATSB treat BFO as a physical Doppler residual. No public demonstration has shown a 2014-era 777 SDU emitting a false BFO while keeping a consistent BTO.

Open questionOpen

Is the public ACARS log missing a block of messages?

Jericho 2019 attributes a ~26-minute exclusion in the released ACARS traffic log and an ACARS-unavailable window of roughly 22–78 minutes. Needs a line-by-line check against the MOT 2015 Factual Information ACARS appendix.

Open questionOpen

What was actually taken on 9 March — and did it include radar?

CSM said minutes of crisis meetings and classified documents, some related to MH370. The working chart asks whether radar information or discussions of the turn-back were in that set. No public loot list answers it. A negative would also be a finding.

HypothesisOpen

A BIG SAFARI collection architecture around MH370

The family is documented. A specific 8 March operation is open.

Gorgon Stare, Blue Devil and MAGIC/Orion are one overlapping ISR family under 645 AESG / BIG SAFARI: same office, overlapping WAMI/SIGINT sensors, reusable GFE through Greenville, and a podded architecture meant to move between airframes. That family is confirmed. Whether any of it collected MH370 is not established and is not ruled out.

Open questionOpen

Can the Motorola and mangosteen cargo be rebuilt at carton level?

Working-log Q28–Q35: airway bill 232-10677085, Motorola SKUs, whether radios/transmitters were present, CG effects, and why the Motorola consignment was not X-rayed.

Open questionOpen

Can WSPR actually track MH370?

Godfrey’s circle near 29.1°S 99.9°E has not been AUV-searched. The method is unpublished in accredited journals and the database is closed. Correlation with simulator coordinates is not identification.

LocationOpen

Diego Garcia

British Indian Ocean Territory · collection-geography question

US/UK atoll. CTBTO HA08 North hydrophones went dark in March 2014 after a deep-ocean cable break. UCT-2 was on the island that month on near-shore HDAS cables. Neither fact is a finding that MH370 was collected or hidden here.

Open questionOpen

Does the classified Lin addendum name MH370 or a satellite video?

Public FOIA production does not. The addendum is unreleased. Until it is, the leaker identification remains a Forbes attribution.

Open questionOpen

Was Gorgon Stare Increment 2 operational on 8 March 2014?

Sierra Nevada (1 Jul 2014): deployed to Afghanistan ‘earlier this year’ and at IOC. Air & Space Forces (7 Apr 2014): Col Brandon Baker — second iteration ‘has been tried operationally’ and would undergo a six-month evaluation. Mercury SEC: 18-month QRC delivery from a 2011 win. None of these pin 7–8 March.

Open questionOpen

What platform received the FY2013 dual-band RF Persistent Sensing integration?

PB2015: completed and integrated onto an ‘identified platform,’ then the effort ended. Public exhibits do not name it. FIRST RF / Shadow 200 and ISIS test-facility work are documented UHF/X-band alternatives. Orion is chronology-only.

Open questionOpen

What was on Orion flights 2–17 between August 2013 and March 2014?

First flight: no mission system. Flight 18 (Dec 2014): ballast. The MH370-relevant interval is the unlisted sorties in between, plus whether the ‘second flight series’ PB2015 said was being scheduled had begun by 8 March.

Open questionOpen

Where is the main wreckage?

Not in the 120,000 km² ATSB box, not in the 2018 Ocean Infinity corridor, not in the 7,571 km² surveyed in 2025–26. Remaining 7,428 km² under contract to June 2027.

Open questionOpen

Which of the ten theatre dossiers can actually be pulled?

The forensic board’s bottom row: 4 March Boeing statement of work; P-8/P-3 7–8 March sortie logs; Global Hawk records; Pinckney/Kidd pre-search tracks; JORN operating/tasking logs; SBIRS retrospective; Five Eyes MH370 correspondence; Boeing performance datasets; 9M-MRO avionics/mod configuration; early US intel reporting.

Open questionOpen

Who was flying after IGARI?

Official report: cannot establish if anyone other than the two pilots was at the controls. Manual inputs likely; actor unknown.

Open questionOpen

Why did SAR start in the wrong ocean for days?

Military primary radar and live SATCOM existed while the public search flew the South China Sea. Minister ~10:30 MYT; KL ARCC 22:30; Thai Surat Thani 18–19 March. GADSS is the policy answer; the night-of organisational failure is still a research subject.

EvidenceOpen20 Sep 2026

Remote-control claims versus evidence gaps

Patent, QF-16, Teso FMS proof-of-concept · installation on 9M-MRO still open

Working chart: unmanned flight of a fighter-class jet was demonstrated in 2013; Boeing’s uninterruptible-autopilot patent exists; Hugo Teso showed an FMS proof-of-concept the same year. Boeing told Malaysian investigators there was no commercial implementation on the 2002 delivery. Radar proves a turn at IGARI, not who commanded it. Ten data requests remain.

OrganisationConfirmed1 Jul 2014 00:00 UTC

Gorgon Stare

BIG SAFARI wide-area surveillance · podded, not MQ-9-only

Developed through BIG SAFARI. Increment 2 is ARGUS-derived EO plus Exelis IR. Congress treated the podded/open architecture as integrable on more than one aircraft type. MQ-9 is the documented host; an Orion fit by 8 March 2014 is open. 2013 OSD figure: 2 fps, not 6.

EvidenceProbable1 Jan 2012

Aurora Orion contract FA8620-12-C-3027

~$86.56m aggregated · completion extending to 2019

Public award aggregation for the BIG SAFARI / Orion definitive contract. Transaction-level FPDS history — especially modifications August 2013–March 2014 — is still open. Budget authority, ceilings and obligations are not the same as cash spent.

ClaimConfirmed

Cubic remote-pilot patent was maintained through March 2014

US6641087B1: 4-year fee 4 May 2007, 8-year fee 4 May 2011, expired 4 Nov 2015 for later non-payment. Continuation US10/684,316 abandoned 18 Jan 2007. IP interest retained; prototype/certification still OPEN.

HypothesisOpen

Freescale as a causal thread

Twenty employees confirmed; assignment unreconstructed

Presence is a fact. A defence, inertial, or communications assignment that would matter to MH370 is an open question, not a finding.

ClaimConfirmed

FY2013 Endurance UAV budget jumped via Congressional adds, not a hidden presidential request

PE 0305205F: previous PB $21m → $74.126m. MAGIC $50m add; Endurance UAV Base $9.893m. Documented. Who sponsored the add remains open.

ClaimConfirmed

Gorgon Stare’s podded architecture was designed for more than MQ-9

HASC 113-102: open/podded architecture permitted integration on multiple aircraft types. Aviation Week 2010 named it as a potential MAGIC payload. An Orion installation by 8 March 2014 is not shown.

OrganisationConfirmed15 Oct 2014

Lockheed Martin Compact Fusion Reactor

Public Skunk Works programme · Thomas McGuire · not an MH370 finding

Confirmed as a public Lockheed Skunk Works fusion project, discussed openly around 2014, with patents including US9947420 (magnetic-field plasma confinement; filing family 2 April 2014). Quiet Exodus treats it as the power core of a clandestine spacetime platform. That leap is the thesis, not the patent.

ClaimConfirmed

MAGIC was designed for multi-INT payload modularity, not only endurance

OSD PB2012 lists EO/IR, SIGINT, GMTI, wide-area surveillance, communications relay and strike as modular payload classes, plus reduced-manning / open-architecture avionics. That is the documented architecture. It is not an installed-GFE list for March 2014.

ClaimUnverified18 Sep 2026

MAGIC, Aurora and Boeing/NRL patents drop from the paper trail in 2014

Follow-up briefing: Aurora’s remote-operation work for the US military from about 2010; MAGIC and several Boeing and NRL patents then become hard to find in open documents in 2014. Redacted Blue Devil letters are shown with matching date cut-offs.

TimelineConfirmed15 Dec 2014

Orion flight 18 — 80-hour record with 1,000 lb ballast

December 2014 · not an ISR-payload demonstration

Aurora’s endurance attempt was flight 18 and carried 1,000 lb of ballast. Maiden flight (no mission system) and this record flight both fail as evidence of an operational ISR stack. Payload on flights 2–17 remains open.

DocumentProbable15 Nov 2024

The Debris Swarm

Jeff Wise · Finding MH370 S1E19 · 15 November 2024 · 39:26

After six months with only the Réunion flaperon, a cluster of western-Indian-Ocean pieces appears in 2016. CSIRO reverse-drift and barnacle work are the scientific spine; the swarm’s timing is the puzzle Wise keeps open.

EvidenceOpen9 Mar 2014

The radar story and the 9 March cyberattack

Working chart · tracks, delays, and a spear-phish of the investigation

Two panels. Left: civilian secondary, Malaysian military primary, Thai paint disclosed ten days later, and the 12-hour lag before the civilian rescue centre was told. Right: one day after the loss, officials on the investigation were hit with a spear-phish that CyberSecurity Malaysia later said stole classified material toward an IP in China. Presence of a hack is confirmed as that agency’s public account. What was in the take — and whether it included radar — is still open.

EvidenceConfirmed8 Mar 2014

US military presence in theatre, 7–9 March 2014

Public-source board · confirmed search assets vs records still needed

Working chart of publicly documented US assets around MH370: USS Pinckney already in the South China Sea and diverted to search on 8 March; a Kadena P-3C announced the same day; USS Kidd joined. Guam RQ-4, Diego Garcia sensors, EP-3E, RC-135 and exact 7–9 March sortie lists remain open. Presence is not the same as tracking 9M-MRO.

Open questionOpen

What is the bridge from the ISR family to MH370?

Gorgon Stare, Blue Devil and MAGIC/Orion are a documented family under BIG SAFARI. The open question is one specific platform, sensor, command link, contract, deployment or test event in both that family and the MH370 window. Until that object is found, involvement is not established — and is not ruled out.

DocumentUnverified1 Mar 2024

Why Planes Vanish: The Mystery of Flight MH370

BBC · tenth-anniversary feature · WSPR

BBC anniversary piece that brought Weak Signal Propagation Reporter analysis to a general audience. Richard Godfrey’s method is not peer-reviewed; the data are not an open, reproducible track.

PersonOfficial finding

Zaharie Ahmad Shah

Pilot in command · MH370

Last attributed radio call: “Good night Malaysian three seven zero.” Home simulator files exist; the 2018 report did not treat them as a reconstructed plan. Who was flying after IGARI is open.

ClaimUnverified

A China IP is not a finding that Beijing ran the 9 March hack

Routing fact · operator unknown

CSM said exfiltrated mail went to an IP address in China. Headlines called it a Chinese hack. The agency did not publish a named operator. Compromised machines, third-party infrastructure and a false flag remain live. Not established, not ruled out.

ClaimOpen

A specific MH370 collection event is not yet on the record — and is not ruled out

MAGIC/Orion, Gorgon Stare and Blue Devil form a documented overlapping family under BIG SAFARI. That family is not, by itself, a platform, sensor or sortie on 8 March 2014. The same material does not rule such a deployment out.

OrganisationConfirmed24 Aug 2013 00:00 UTC

Aurora Orion RPA

Twin-diesel MALE UAS · China Lake first flight 24 Aug 2013

Selected air vehicle for MAGIC: a multi-day, medium-altitude remotely piloted ISR platform designed to carry multiple sensors. First flight (24 Aug 2013) had no mission system; the December 2014 endurance record carried ballast. Those two flights do not decide what was fitted on sorties 2–17, including March 2014.

EvidenceOpen8 Mar 2014

BD764 and BE144 — named radar feeds, and a gap after 18:02:59 UTC

Secondary ends with the transponder · primary westbound · later points still to source

The working chart labels two Malaysian Air Defence datasets: BD764 (secondary, 10-second intervals, early flight, ends 01:21 MYT with the transponder) and BE144 (primary, 10-second intervals, westbound after the turn, ends 18:02:59 UTC). The 2018 reconstruction then shows a last military return at 18:22:12 UTC after a gap. Those later points exist in the official track. Their raw source is not public.

OrganisationConfirmed14 Mar 2011 00:00 UTC

Blue Devil I / II

Operational Block 1 WAAS + SIGINT · Block 2 residuals to BIG SAFARI

Block 1 was operational: manned aircraft carrying Angel Fire-derived wide-area imagery integrated with SIGINT. Block 2, the airship, was terminated — but its equipment, including GFE, was packed and sent to a BIG SAFARI facility in Greenville, Texas, available for other programmes. The technology did not vanish with the airship.

TimelineProbable31 Dec 2013

Blue Devil I operational demonstration ends

31 December 2013 · four King Airs returning to Leidos

Attributed via Inside the Air Force, 22 Jan 2014, quoting USAF officials. The four leased King Airs were returning to Leidos, so the original Afghanistan fleet was not an operational candidate on 8 March 2014. The multi-INT sensor package remained US Government property and was being assessed for reassignment (MC-12 and MQ-9 mentioned, not selected). The sensors did not disappear with the lease.

TimelineConfirmed23 May 2012 00:00 UTC

Blue Devil II stopped; hardware to Greenville

Payload stop 4 Jan 2012 · pack-out May 2012 · storage Q4 FY2012

Airship programme killed. Equipment packed and transferred to a BIG SAFARI-managed facility in Greenville, Texas. Components were available for other projects. Residual parts were later absorbed into other Air Force programmes.

EvidenceConfirmed4 Mar 2014

Boeing–NAVAIR delivery order signed 4 March 2014

$955,853.54 · N0001914D0012 · engineering/technical support · St Louis

Confirmed public contracting record, four days before MH370. Department of the Navy, Naval Air Systems Command, NAICS aircraft manufacturing, PSC R425 professional engineering/technical support. Subject of the order is not in the public header. Chronology is not a collection event.

EvidenceOfficial finding7 Mar 2014 16:00 UTC

Cargo, including lithium-ion batteries

Manifest reviewed; fire hypothesis not supported

The aircraft carried cargo including lithium-ion batteries. The investigation found they were packed to regulation and did not support a cargo-fire cause.

TimelineConfirmed4 Nov 2003 00:00 UTC

Cubic Defense anti-hijack remote-pilot patent granted

US6641087B1 · filed 9 Oct 2001 · granted 4 Nov 2003

Commercial-aircraft retrofit module: deactivate cockpit controls, satellite-relayed remote guidance, optional comms disable, FDR/CVR uplink. Confirmed IP. No evidence of airline installation.

DocumentConfirmed26 Jan 2011

FIRST RF Phase II — dual-band UHF/X-band airborne SAR

FA8650-11-C-1016 · $749,593 · start 26 Jan 2011 · topic AF093-138

Official SBIR: lightweight dual-band UHF/X-band SAR on a modified Artemis COTS radar plus FIRST RF single-aperture antenna. SWaP ~20 lb / 150 W. Design target included Shadow 200. A concrete alternative to treating Orion as the unnamed FY2013 RF Persistent Sensing platform.

TimelineConfirmed3 Sep 2015 00:00 UTC

Flaperon confirmed as 9M-MRO

3 September 2015

French authorities confirm the Réunion flaperon belongs to MH370. The disappearance is no longer a missing-aircraft case without wreckage.

DocumentUnverified1 Mar 2019 00:00 UTC

Flight MH370 — 17 Fascinating Facts

J. Jericho / The Free School · March 2019 · Drive backup PDF

Independent compilation of official-file facts with annexes (simulator pages, passenger list, cargo docs, Boeing patent, ACARS log). Not an official report. Several numbered “facts” still need MOT/ATSB cross-check.

EvidenceOpen20 Sep 2026

Forensic evidence board — facts, capabilities, missing dossiers

Working chart of intersections · ten target records still outstanding

Cork-board reconstruction: Malaysian military radar and MH370 data on one side; QF-16 2013, UAV/UAS patents, JORN, Kadena P-8A/P-3C, Inmarsat SATCOM and Boeing range models on the other. The bottom row is the live request list — Boeing’s 4 March statement of work, sortie logs, Global Hawk, Pinckney/Kidd tracks, JORN tasking, SBIRS, Five Eyes correspondence, 9M-MRO avionics configuration.

ClaimConfirmed

Gorgon Stare, Blue Devil and MAGIC/Orion are one overlapping ISR family under BIG SAFARI

Confirmed by Congressional and USAF budget records. Same office, overlapping sensors (WAMI, SIGINT, airborne processing), shared GFE path through Greenville, and a podded architecture meant to move between airframes. Not isolated programmes that happen to share a decade.

LocationConfirmed

Greenville, Texas

BIG SAFARI facility · Blue Devil II GFE available for other programmes

Q4 FY2012 destination of stopped Blue Devil II airship equipment, including government-furnished components. FY2014 USAF budget language: components available for other projects. Later inventory, including March 2014, is not published.

DocumentConfirmed7 Jun 2013

HASC Report 113-102 — Gorgon Stare to recapitalise Blue Devil

House Armed Services Committee · 7 June 2013 · USD(I)/USAF report due 14 Feb 2014

Primary Congressional source: Gorgon Stare is the USAF’s only operational persistent day/night WAMI capability and the logical programme to recapitalise Blue Devil technologies, capabilities and lessons learned. Directed evolution into WAMI + near-vertical direction-finding SIGINT, leveraging Blue Devil PED. Report due 14 February 2014 — 22 days before MH370.

OrganisationConfirmed1 Jul 2010 00:00 UTC

MAGIC

Medium Altitude Global ISR and Communications

USAF endurance-ISR programme. Air vehicle: Aurora Orion. Office: 645 AESG / BIG SAFARI — the same rapid-acquisition group that ran Gorgon Stare and took Blue Devil residuals. Confirmed as a multi-day ISR platform in that family. A specific MH370 operation is not established and is not ruled out.

TimelineConfirmed1 Jul 2010 00:00 UTC

MAGIC JCTD initiated

FY2010 Q3 · OSD/DDR&E

Competition among five defence-industry partners. $5m initial to AFRL. CENTCOM persistent-ISR sponsorship in Aurora’s 2010 release.

ClaimConfirmed

MAGIC/Orion continued in USAF development after 2014

Confirmed by PB2020. Congressional adds through FY2018. The ‘faded after 2014’ formulation is a correction, not a secrecy finding.

DocumentOfficial finding18 Sep 2026 00:00 UTC

MH370 / US Military ISR Working Research Report v1

Working paper · 18 September 2026

Working paper on US military ISR programmes in the MH370 window: MAGIC, Orion, Gorgon Stare, Blue Devil and remote-control patents, read as one overlapping family under BIG SAFARI. The family is documented. A specific MH370 collection is not established and is not ruled out.

DocumentDisputed19 Feb 2020

MH370: The Untold Story / The Cover-Up

Peter Stefanovic · Sky News 2020 · later Amazon two-part

Interviews with Tony Abbott, Warren Truss and Sir Angus Houston on the first hours, plus Capt. Byron Bailey’s claim that the aircraft was hidden on purpose. Radar-sharing delay is documented; “hidden” is Bailey’s inference.

ClaimUnverified6 Dec 2025

Michael Selig testimony — Diego Garcia, Gorgon Stare, cold plasma

Nic Moneypenny notes a written and recorded account by Michael Selig, former fast-jet pilot who flew into Diego Garcia, describing an MH370 end-state, a leaked video, Gorgon Stare and scalar / plasma language.

PersonConfirmed

Najib Razak

Prime Minister of Malaysia, 2014

On 24 March 2014 announced that MH370 ended in the southern Indian Ocean with no survivors, based on Inmarsat’s then-new analysis.

TimelineConfirmed15 Dec 2014 00:00 UTC

Orion 80-hour remotely controlled flight

December 2014 · 1,000 lb ballast · fuel for ~37 more hours

Contractor-confirmed endurance after MH370. This was flight 18 and carried 1,000 lb of ballast. Shows the air vehicle matured; does not rewind payload status to March.

ClaimConfirmed

Orion’s first flight carried no mission system

Confirmed by contemporary September 2013 reporting and consistent with PB2015’s FY2014 “best of breed” sensor-selection language. December 2014 endurance attempt was flight 18 with 1,000 lb ballast — also not an ISR-payload demonstration. Those two flights do not decide what Orion was, and they do not decide March 2014.

TimelineOfficial finding8 Mar 2014 14:30 UTC

RMAF notifies KL ARCC of the western military track

22:30 MYT 8 March 2014 · ~12 hours after the minister

SAR chronology: civilian rescue centre informed of the possible turn-back / western last-known at 22:30 Malaysian time. Ministerial awareness ~10:30. The gap is a documented information-latency issue, not by itself a finding of a cover-up.

273 records in the file.