Skip to content

Resources

Resources

Official papers, films, Wikipedia and its citations, programmes, claims and open questions.

24 hits

Open questionOpen

Where did Blue Devil residual components go?

Block 2 equipment, including government-furnished components, was packed and transferred to a BIG SAFARI-managed facility in Greenville, Texas, available for other projects. Residual parts were absorbed into other Air Force programmes. Later inventory — including March 2014 — is not published.

EvidenceOfficial finding15 Mar 2014 00:00 UTC

BTO range rings and BFO Doppler residuals

Inmarsat / Ashton et al. · Journal of Navigation

Burst Timing Offset describes distance from the satellite (an arc on the Earth). Burst Frequency Offset encodes relative motion and is why official analysis went south, not north.

ClaimOpen

Third-party intervention cannot be excluded

Quoted residual from the 2018 report. Not a finding that it happened.

OrganisationConfirmed14 Mar 2011 00:00 UTC

Blue Devil I / II

Operational Block 1 WAAS + SIGINT · Block 2 residuals to BIG SAFARI

Block 1 was operational: manned aircraft carrying Angel Fire-derived wide-area imagery integrated with SIGINT. Block 2, the airship, was terminated — but its equipment, including GFE, was packed and sent to a BIG SAFARI facility in Greenville, Texas, available for other programmes. The technology did not vanish with the airship.

TimelineConfirmed23 May 2012 00:00 UTC

Blue Devil II stopped; hardware to Greenville

Payload stop 4 Jan 2012 · pack-out May 2012 · storage Q4 FY2012

Airship programme killed. Equipment packed and transferred to a BIG SAFARI-managed facility in Greenville, Texas. Components were available for other projects. Residual parts were later absorbed into other Air Force programmes.

Open questionOpen

Where is the 14 February 2014 USD(I)/USAF Gorgon Stare / Blue Devil strategy report?

HASC 113-102 required it 22 days before MH370. It may name platforms, residual Blue Devil components, integration status and fielding chronology.

Open questionOpen

Could the Inmarsat BFO have been spoofed?

Wise’s northern path stands or falls on this. Inmarsat and ATSB treat BFO as a physical Doppler residual. No public demonstration has shown a 2014-era 777 SDU emitting a false BFO while keeping a consistent BTO.

DocumentConfirmed19 Sep 2013 00:00 UTC

DODIG-2013-128 — Blue Devil Block 2

DoD Inspector General · 19 September 2013 · 54 pages · Drive source copy

Primary. FA8620-11-C-4024, ~$149m spent, payload stop 4 Jan 2012, residual components absorbed into other Air Force programmes.

OrganisationConfirmed1 Jul 2010 00:00 UTC

MAGIC

Medium Altitude Global ISR and Communications

USAF endurance-ISR programme. Air vehicle: Aurora Orion. Office: 645 AESG / BIG SAFARI — the same rapid-acquisition group that ran Gorgon Stare and took Blue Devil residuals. Confirmed as a multi-day ISR platform in that family. A specific MH370 operation is not established and is not ruled out.

HypothesisOpen

Terrorism

Hijack or bomb — not adopted as a finding

Stolen passports and a residual third-party clause keep the hypothesis in the file. No claim of responsibility, no identified bomb, no identified hijack crew.

OrganisationConfirmed

645 AESG / BIG SAFARI

USAF rapid acquisition — the office that binds this family

645 AESG / BIG SAFARI ran specialised rapid-development ISR. It executed MAGIC, developed Gorgon Stare, and took Blue Devil equipment into a facility it managed at Greenville, Texas. That is the documented organisational centre of this technology family, not a coincidence of names.

HypothesisOpen

A BIG SAFARI collection architecture around MH370

The family is documented. A specific 8 March operation is open.

Gorgon Stare, Blue Devil and MAGIC/Orion are one overlapping ISR family under 645 AESG / BIG SAFARI: same office, overlapping WAMI/SIGINT sensors, reusable GFE through Greenville, and a podded architecture meant to move between airframes. That family is confirmed. Whether any of it collected MH370 is not established and is not ruled out.

ClaimOpen

A specific MH370 collection event is not yet on the record — and is not ruled out

MAGIC/Orion, Gorgon Stare and Blue Devil form a documented overlapping family under BIG SAFARI. That family is not, by itself, a platform, sensor or sortie on 8 March 2014. The same material does not rule such a deployment out.

TimelineProbable31 Dec 2013

Blue Devil I operational demonstration ends

31 December 2013 · four King Airs returning to Leidos

Attributed via Inside the Air Force, 22 Jan 2014, quoting USAF officials. The four leased King Airs were returning to Leidos, so the original Afghanistan fleet was not an operational candidate on 8 March 2014. The multi-INT sensor package remained US Government property and was being assessed for reassignment (MC-12 and MQ-9 mentioned, not selected). The sensors did not disappear with the lease.

DocumentUnverified1 Mar 2019 00:00 UTC

Flight MH370 — 17 Fascinating Facts

J. Jericho / The Free School · March 2019 · Drive backup PDF

Independent compilation of official-file facts with annexes (simulator pages, passenger list, cargo docs, Boeing patent, ACARS log). Not an official report. Several numbered “facts” still need MOT/ATSB cross-check.

ClaimConfirmed

Gorgon Stare, Blue Devil and MAGIC/Orion are one overlapping ISR family under BIG SAFARI

Confirmed by Congressional and USAF budget records. Same office, overlapping sensors (WAMI, SIGINT, airborne processing), shared GFE path through Greenville, and a podded architecture meant to move between airframes. Not isolated programmes that happen to share a decade.

LocationConfirmed

Greenville, Texas

BIG SAFARI facility · Blue Devil II GFE available for other programmes

Q4 FY2012 destination of stopped Blue Devil II airship equipment, including government-furnished components. FY2014 USAF budget language: components available for other projects. Later inventory, including March 2014, is not published.

EvidenceConfirmed7 Mar 2014 16:00 UTC

Inmarsat signalling-unit log for 9M-MRO

Perth Ground Earth Station · 7–8 March 2014

The table of channel, BTO, BFO and message type that underpins every arc on every search map. Released by Malaysia with Inmarsat notes.

DocumentConfirmed1 May 2014 00:00 UTC

Inmarsat signalling-unit logs for 9M-MRO

Perth Ground Earth Station · 7–8 March 2014

The raw-ish tables of channel, BTO, BFO and message type that underpin every arc on every search map. Released by Malaysia with Inmarsat explanatory notes.

TimelineConfirmed17 Aug 2011

L-3 Greenville awarded Blue Devil 2 integration / test

FA8620-06-G-4003 / order 1157 · $12.054m · 17 Aug 2011

L-3 Communications Integrated Systems, Greenville, Texas, paid for BD2 airship integration and test support. Later Q4 FY2012 storage was also at a 645 AESG-managed Greenville facility. Geographic coincidence is not a custody finding.

ClaimConfirmed

No group claimed MH370

Twelve years on, no organisation has issued a credible claim of responsibility. Absence of a claim is not proof of innocence; it is a fact that sits next to the stolen passports.

HypothesisOpen

Third-party intervention

Official report: cannot be excluded

The Annex 13 team wrote that intervention by a third party cannot be excluded. Remote hijack as implemented technology on commercial 777s was ruled out.

EvidenceConfirmed8 Mar 2014 00:00 UTC

Two stolen European passports

Italian and Austrian documents · two Iranian travellers

Yes — two Iranian men were on board. They travelled on stolen European passports (Italian and Austrian), not Iranian documents. The official investigation treated them as likely asylum seekers and did not adopt a terrorism finding.

Open questionOpen

What is the bridge from the ISR family to MH370?

Gorgon Stare, Blue Devil and MAGIC/Orion are a documented family under BIG SAFARI. The open question is one specific platform, sensor, command link, contract, deployment or test event in both that family and the MH370 window. Until that object is found, involvement is not established — and is not ruled out.

273 records in the file.