Resources
Resources
Official papers, films, Wikipedia and its citations, programmes, claims and open questions.
24 hits
Wikipedia — Malaysia Airlines Flight 370
en.wikipedia.org · living page · read 18 September 2026
Crowd-maintained digest of the public case: 239 dead, 9M-MRO, 8 March 2014, KUL–PEK, cause undetermined. Useful as a citation map into ATSB, MOT, Inmarsat and Ocean Infinity. Not a primary source.
Wikipedia — search for MH370
South China Sea to Ocean Infinity 2027
Most expensive aviation search. Surface 4.5 million km² in 2014; ATSB 120,000 km² underwater; Ocean Infinity 112,000 km² in 2018 and a 15,000 km² 2025–27 box. No main wreckage.
Wikipedia timeline — night of 7–8 March 2014
Duty sign-in through failed 09:15 handshake
Compiled public chronology: captain sign-in 22:50 MYT 7 March, F/O 23:15, SDU log-on 00:00, push 00:27, takeoff 00:42, FL350 01:01, last ACARS 01:07, last voice 01:19:30, transponder 01:21:13, Penang cell 01:52, last radar 02:22, SDU log-on 02:25, hourly pings, last transmission 08:19:37, no reply 09:15.
Blue Devil II stopped; hardware to Greenville
Payload stop 4 Jan 2012 · pack-out May 2012 · storage Q4 FY2012
Airship programme killed. Equipment packed and transferred to a BIG SAFARI-managed facility in Greenville, Texas. Components were available for other projects. Residual parts were later absorbed into other Air Force programmes.
FY2013 Endurance UAV budget jumped via Congressional adds, not a hidden presidential request
PE 0305205F: previous PB $21m → $74.126m. MAGIC $50m add; Endurance UAV Base $9.893m. Documented. Who sponsored the add remains open.
Transponder dropped in two steps, not as a single failure
Mentour Pilot and others: Mode S / TA-RA selected off seconds after IGARI; the remaining secondary-radar symbol gone ~37 seconds later; then the left turn. A total electrical failure would have blanked every emitter at once.
Blue Devil I / II
Operational Block 1 WAAS + SIGINT · Block 2 residuals to BIG SAFARI
Block 1 was operational: manned aircraft carrying Angel Fire-derived wide-area imagery integrated with SIGINT. Block 2, the airship, was terminated — but its equipment, including GFE, was packed and sent to a BIG SAFARI facility in Greenville, Texas, available for other programmes. The technology did not vanish with the airship.
Captain’s home flight-simulator files
Imaged by RMP · restored coordinates mapped by commentators
Files exist. A restored route into the southern Indian Ocean has been published. The 2018 report did not treat this as a reconstructed plan.
645 AESG / BIG SAFARI
USAF rapid acquisition — the office that binds this family
645 AESG / BIG SAFARI ran specialised rapid-development ISR. It executed MAGIC, developed Gorgon Stare, and took Blue Devil equipment into a facility it managed at Greenville, Texas. That is the documented organisational centre of this technology family, not a coincidence of names.
HASC Report 113-102 — Gorgon Stare to recapitalise Blue Devil
House Armed Services Committee · 7 June 2013 · USD(I)/USAF report due 14 Feb 2014
Primary Congressional source: Gorgon Stare is the USAF’s only operational persistent day/night WAMI capability and the logical programme to recapitalise Blue Devil technologies, capabilities and lessons learned. Directed evolution into WAMI + near-vertical direction-finding SIGINT, leveraging Blue Devil PED. Report due 14 February 2014 — 22 days before MH370.
Blue Devil, MAGIC, Orion, BIG SAFARI — 2014 window
Briefing collages, 18 September 2026
Nic Moneypenny published investigation collages placing Blue Devil (including an egg-shaped airship), MAGIC, Aurora Orion, BIG SAFARI, Lockheed and DARPA in the same 2013–14 spending window as MH370, with Freescale’s last gyro presentation among the plates.
Gorgon Stare
BIG SAFARI wide-area surveillance · podded, not MQ-9-only
Developed through BIG SAFARI. Increment 2 is ARGUS-derived EO plus Exelis IR. Congress treated the podded/open architecture as integrable on more than one aircraft type. MQ-9 is the documented host; an Orion fit by 8 March 2014 is open. 2013 OSD figure: 2 fps, not 6.
Greenville, Texas
BIG SAFARI facility · Blue Devil II GFE available for other programmes
Q4 FY2012 destination of stopped Blue Devil II airship equipment, including government-furnished components. FY2014 USAF budget language: components available for other projects. Later inventory, including March 2014, is not published.
JORN not tasked the night of 7–8 March 2014
Australian over-the-horizon radar · peacetime status
Wikipedia and Australian statements: Jindalee Operational Radar Network was not operational / not tasked that night. Absence of a JORN track is not a northern-path proof.
NAWS China Lake
Orion first flight · 24 August 2013
US Navy air weapons station in California. Orion and GCS shipped here July 2013.
A BIG SAFARI collection architecture around MH370
The family is documented. A specific 8 March operation is open.
Gorgon Stare, Blue Devil and MAGIC/Orion are one overlapping ISR family under 645 AESG / BIG SAFARI: same office, overlapping WAMI/SIGINT sensors, reusable GFE through Greenville, and a podded architecture meant to move between airframes. That family is confirmed. Whether any of it collected MH370 is not established and is not ruled out.
Aurora Orion RPA
Twin-diesel MALE UAS · China Lake first flight 24 Aug 2013
Selected air vehicle for MAGIC: a multi-day, medium-altitude remotely piloted ISR platform designed to carry multiple sensors. First flight (24 Aug 2013) had no mission system; the December 2014 endurance record carried ballast. Those two flights do not decide what was fitted on sorties 2–17, including March 2014.
CTBTO HA08 North at Diego Garcia went dark in March 2014
Cable break ~189 km offshore · South array kept listening
Confirmed by CTBTO. The northern hydroacoustic segment of HA08, off Diego Garcia, suffered a trunk-cable fault in March 2014 about 189–190 km from shore, more than a kilometre and a half down. HA08 South continued. North stayed silent for twelve years. A conventional splash in the southern Indian Ocean is not thereby erased — Cape Leeuwin (HA01) and HA08 South remained in the network.
Cubic Defense anti-hijack remote-pilot patent granted
US6641087B1 · filed 9 Oct 2001 · granted 4 Nov 2003
Commercial-aircraft retrofit module: deactivate cockpit controls, satellite-relayed remote guidance, optional comms disable, FDR/CVR uplink. Confirmed IP. No evidence of airline installation.
Gorgon Stare, Blue Devil and MAGIC/Orion are one overlapping ISR family under BIG SAFARI
Confirmed by Congressional and USAF budget records. Same office, overlapping sensors (WAMI, SIGINT, airborne processing), shared GFE path through Greenville, and a podded architecture meant to move between airframes. Not isolated programmes that happen to share a decade.
Last voice contact
17:19:30 UTC · “Good night Malaysian three seven zero”
Lumpur Radar transfers MH370 to Ho Chi Minh. The reply — attributed to the captain — is the last recorded voice transmission from the flight.
Orion 80-hour remotely controlled flight
December 2014 · 1,000 lb ballast · fuel for ~37 more hours
Contractor-confirmed endurance after MH370. This was flight 18 and carried 1,000 lb of ballast. Shows the air vehicle matured; does not rewind payload status to March.
Two waves of MH370-themed cyberattacks
9 March official-network intrusion · March–April public malware lures

Working chart of two separate campaigns. Attack one: 9 March spear-phish of officials at the Department of Civil Aviation, National Security Council and Malaysia Airlines — CyberSecurity Malaysia’s public account, disclosed in August. Attack two: MyCERT alerts on 24 March and 18 April about MH370-themed backdoors and a fake investigation-transcript phish aimed more widely. Destination IP in China is not the same as a finding that Beijing ran the operation.
Zaharie Ahmad Shah
Pilot in command · MH370
Last attributed radio call: “Good night Malaysian three seven zero.” Home simulator files exist; the 2018 report did not treat them as a reconstructed plan. Who was flying after IGARI is open.
273 records in the file.