Skip to content

Resources

Resources

Official papers, films, Wikipedia and its citations, programmes, claims and open questions.

55 hits

EvidenceConfirmed1 Sep 2013

Gorgon Stare documented at 2 fps, not 6 fps

OSD September 2013 comparison figure

Primary pre-MH370 report labels Gorgon Stare 2 fps versus 30 fps FMV. A claimed ~6 fps match to Increment 2 is not established, pending an Increment-2 specification.

ClaimUnverified6 Dec 2025

Michael Selig testimony — Diego Garcia, Gorgon Stare, cold plasma

Nic Moneypenny notes a written and recorded account by Michael Selig, former fast-jet pilot who flew into Diego Garcia, describing an MH370 end-state, a leaked video, Gorgon Stare and scalar / plasma language.

ClaimDisputed

Alleged-video 6 fps ‘Gorgon Stare match’ is contradicted by the 2013 OSD report

The 6 fps ‘Gorgon Stare match’ claimed for alleged video is not established. 2 fps is the documented comparison figure. Increment 2’s rate is unpublished here.

OrganisationConfirmed1 Jul 2014 00:00 UTC

Gorgon Stare

BIG SAFARI wide-area surveillance · podded, not MQ-9-only

Developed through BIG SAFARI. Increment 2 is ARGUS-derived EO plus Exelis IR. Congress treated the podded/open architecture as integrable on more than one aircraft type. MQ-9 is the documented host; an Orion fit by 8 March 2014 is open. 2013 OSD figure: 2 fps, not 6.

ClaimConfirmed

Gorgon Stare’s podded architecture was designed for more than MQ-9

HASC 113-102: open/podded architecture permitted integration on multiple aircraft types. Aviation Week 2010 named it as a potential MAGIC payload. An Orion installation by 8 March 2014 is not shown.

Open questionOpen

Was Gorgon Stare Increment 2 operational on 8 March 2014?

Sierra Nevada (1 Jul 2014): deployed to Afghanistan ‘earlier this year’ and at IOC. Air & Space Forces (7 Apr 2014): Col Brandon Baker — second iteration ‘has been tried operationally’ and would undergo a six-month evaluation. Mercury SEC: 18-month QRC delivery from a 2011 win. None of these pin 7–8 March.

TimelineProbable7 Apr 2014

USAF: Gorgon Stare Increment 2 ‘tried operationally’

Air & Space Forces · 7 April 2014 · Col Brandon Baker

A named USAF official puts Increment 2 operational-trial activity by early April 2014. It does not establish airborne availability on 7–8 March.

OrganisationConfirmed20 Aug 2014

CyberSecurity Malaysia

National cyber agency · publicly described the 9 March intrusion in August 2014

Confirmed. Agency under the then Ministry of Science, Technology and Innovation. CEO Amirudin Abdul Wahab is the named source for the 9 March spear-phish of investigation officials. Digital forensics support to the affected departments; work with police and Interpol.

DocumentConfirmed7 Jun 2013

HASC Report 113-102 — Gorgon Stare to recapitalise Blue Devil

House Armed Services Committee · 7 June 2013 · USD(I)/USAF report due 14 Feb 2014

Primary Congressional source: Gorgon Stare is the USAF’s only operational persistent day/night WAMI capability and the logical programme to recapitalise Blue Devil technologies, capabilities and lessons learned. Directed evolution into WAMI + near-vertical direction-finding SIGINT, leveraging Blue Devil PED. Report due 14 February 2014 — 22 days before MH370.

OrganisationConfirmed

USAF 303rd AESW

Named MAGIC transition organisation in OSD PB2012

OSD planned to provide MAGIC core technologies to the 303rd Aeronautical Systems Wing for further development of a deployable long-endurance UAS. Confirmed as a named office; later 645 AESG / BIG SAFARI execution is a separate fact.

OrganisationConfirmed

645 AESG / BIG SAFARI

USAF rapid acquisition — the office that binds this family

645 AESG / BIG SAFARI ran specialised rapid-development ISR. It executed MAGIC, developed Gorgon Stare, and took Blue Devil equipment into a facility it managed at Greenville, Texas. That is the documented organisational centre of this technology family, not a coincidence of names.

OrganisationConfirmed1 Jan 2012

DARPA WAND

Wide Area Network Detection · coincident WAMI + RF

Live-fly WAMI and RF geolocation fusion in 2012, SOCOM transition, Trident Spectre demonstration. Named in FY2013 NDAA Sec. 927. Part of the overlapping multi-INT ecosystem around Blue Devil and Gorgon Stare. Not shown as an MH370 collector.

OrganisationConfirmed1 Jul 2010 00:00 UTC

MAGIC

Medium Altitude Global ISR and Communications

USAF endurance-ISR programme. Air vehicle: Aurora Orion. Office: 645 AESG / BIG SAFARI — the same rapid-acquisition group that ran Gorgon Stare and took Blue Devil residuals. Confirmed as a multi-day ISR platform in that family. A specific MH370 operation is not established and is not ruled out.

ClaimConfirmed

Gorgon Stare, Blue Devil and MAGIC/Orion are one overlapping ISR family under BIG SAFARI

Confirmed by Congressional and USAF budget records. Same office, overlapping sensors (WAMI, SIGINT, airborne processing), shared GFE path through Greenville, and a podded architecture meant to move between airframes. Not isolated programmes that happen to share a decade.

OrganisationConfirmed

Angel Fire

Wide-area airborne surveillance · lineage into Blue Devil Block 1

USAF/SOCOM WAAS system. Congressional documentation describes Blue Devil Block 1 as integrating Angel Fire-derived wide-area imagery with signals intelligence on manned aircraft. Confirmed as the WAAS ancestor in this family, not as an MH370 collector.

OrganisationConfirmed24 Aug 2013 00:00 UTC

Aurora Orion RPA

Twin-diesel MALE UAS · China Lake first flight 24 Aug 2013

Selected air vehicle for MAGIC: a multi-day, medium-altitude remotely piloted ISR platform designed to carry multiple sensors. First flight (24 Aug 2013) had no mission system; the December 2014 endurance record carried ballast. Those two flights do not decide what was fitted on sorties 2–17, including March 2014.

OrganisationConfirmed14 Mar 2011 00:00 UTC

Blue Devil I / II

Operational Block 1 WAAS + SIGINT · Block 2 residuals to BIG SAFARI

Block 1 was operational: manned aircraft carrying Angel Fire-derived wide-area imagery integrated with SIGINT. Block 2, the airship, was terminated — but its equipment, including GFE, was packed and sent to a BIG SAFARI facility in Greenville, Texas, available for other programmes. The technology did not vanish with the airship.

OrganisationConfirmed

Voice370 / next-of-kin advocates

Family groups pressing for continued search and disclosure

Public advocates including Grace Nathan have argued for resumed underwater search and timely family briefings.

Open questionOpen

Where is the 14 February 2014 USD(I)/USAF Gorgon Stare / Blue Devil strategy report?

HASC 113-102 required it 22 days before MH370. It may name platforms, residual Blue Devil components, integration status and fielding chronology.

OrganisationConfirmed

Aurora Flight Sciences

HALE/MALE autonomy house · Orion prime

Founded 1989. Chiron optionally piloted aircraft 1996. Global Hawk structures since 1995. Centaur optionally piloted DA42 from 2010. AACUS autonomous helicopter demo February 2014. ALIAS is later drop-in copilot work.

OrganisationConfirmed

Australian Transport Safety Bureau

Lead of the 2014–2017 southern Indian Ocean search

Drew and exhausted the 120,000 km² underwater box. Operational-search report is the engineering baseline for later Ocean Infinity boxes.

OrganisationConfirmed

CSIRO

Debris-drift modelling

Reverse-drifted the Réunion flaperon and later debris to weight 7th-arc latitudes.

OrganisationConfirmed

DGA-TA / French judiciary

Flaperon examination, Toulouse

Confirmed the Réunion flaperon as 9M-MRO. Part remains in French judicial custody.

OrganisationConfirmed

DSTG

Defence Science and Technology Group · Bayesian path analysis

Produced the posterior along the 7th arc used to site the official underwater box.

OrganisationConfirmed

ICAO

GADSS tracking standards after MH370

15-minute position reporting in normal flight; faster in distress. The regulatory aftershock.

OrganisationConfirmed

Inmarsat

Classic Aero I-3 · Perth Ground Earth Station

The communications company that became the principal witness to MH370’s last six hours.

OrganisationConfirmed27 Apr 2009 00:00 UTC

ISIS

Integrated Sensor Is Structure · DARPA/USAF airship radar

Same PE as MAGIC. Lockheed integrator, Raytheon radar, ~$400–462m. Stratospheric airship with very large low-power radar. Confirmed programme; no evidence of MH370 collection.

OrganisationConfirmed

Joint Agency Coordination Centre

Australia · southern Indian Ocean search coordination

Stood up to run the multinational southern search after the SATCOM pivot.

OrganisationConfirmed

Lockheed Martin Aeronautics

ISIS systems integrator, Palmdale

Prime on ISIS Phase 3. Confirmed industrial role; no MH370 collection evidence.

OrganisationConfirmed15 Oct 2014

Lockheed Martin Compact Fusion Reactor

Public Skunk Works programme · Thomas McGuire · not an MH370 finding

Confirmed as a public Lockheed Skunk Works fusion project, discussed openly around 2014, with patents including US9947420 (magnetic-field plasma confinement; filing family 2 April 2014). Quiet Exodus treats it as the power core of a clandestine spacetime platform. That leap is the thesis, not the patent.

OrganisationConfirmed

Malaysia Airlines

Operator of MH370 / 9M-MRO

Declared the flight missing at 23:24 UTC while the SDU was still a live Inmarsat terminal.

OrganisationConfirmed

Ocean Infinity

Private seabed search · 2018 and 2025–2027

No-find-no-fee searches along the 7th arc. 2018 ~112,000 km². 2025–26: 7,571 km² of a 15,000 km² box. Contract extended to 30 June 2027.

OrganisationConfirmed

Raytheon Space and Airborne Systems

ISIS radar · MTS for USAF UAVs · large classified SAS bookings

Radar on ISIS; MTS-B is an Orion payload lead. 2013 SAS booked $210m MTS for USAF UAVs and $862m classified. Those totals do not establish an MH370/MAGIC contract.

DocumentConfirmed1 Sep 2013

Thinking About the U.S. Military’s Next-Generation UAS Force

OSD Office of Net Assessment · September 2013 · 112 pp. · HQ0034-09-D-3007-0013

Pre-MH370 OSD-commissioned report. Gorgon Stare / ARGUS-IS / ARGUS-IR: multi-lens arrays, lower frame rate and resolution than HD FMV, areas up to ~40 km². Comparison figure labels conventional FMV 30 fps and Gorgon Stare 2 fps.

DocumentProbable18 Sep 2026

Wikipedia — Malaysia Airlines Flight 370

en.wikipedia.org · living page · read 18 September 2026

Crowd-maintained digest of the public case: 239 dead, 9M-MRO, 8 March 2014, KUL–PEK, cause undetermined. Useful as a citation map into ATSB, MOT, Inmarsat and Ocean Infinity. Not a primary source.

HypothesisOpen

A BIG SAFARI collection architecture around MH370

The family is documented. A specific 8 March operation is open.

Gorgon Stare, Blue Devil and MAGIC/Orion are one overlapping ISR family under 645 AESG / BIG SAFARI: same office, overlapping WAMI/SIGINT sensors, reusable GFE through Greenville, and a podded architecture meant to move between airframes. That family is confirmed. Whether any of it collected MH370 is not established and is not ruled out.

DocumentConfirmed18 Sep 2026 22:50 UTC

MH370 Daily Research — working papers

18 September 2026

Working ISR report, source ledger and master chronology gathered the same day, with a cited-URL set pointing at contemporary MAGIC, Orion and Gorgon Stare reporting.

Open questionOpen

What sensors were actually on Orion by March 2014?

Orion was selected as MAGIC’s multi-day, multi-sensor ISR aircraft. First flight had no mission system; flight 18 (Dec 2014) carried ballast. Those two points do not empty the aircraft. Sorties 2–17, including March 2014, are the hole. Gorgon Stare / MTS-B / VADER remain live leads, not closed fits.

ClaimOpen

A specific MH370 collection event is not yet on the record — and is not ruled out

MAGIC/Orion, Gorgon Stare and Blue Devil form a documented overlapping family under BIG SAFARI. That family is not, by itself, a platform, sensor or sortie on 8 March 2014. The same material does not rule such a deployment out.

HypothesisUnverified

Alleged thermal / wide-area video is authentic collection

Hypothesis to test — provenance not established

Circulating clips are treated as alleged. If genuine, at least one collector must satisfy geometry, band, FOV, altitude and comms. Platform IDs attached to social posts are not accepted as authority. A ~6 fps ‘Gorgon Stare Increment 2 match’ is contradicted by the 2013 OSD 2 fps figure.

DocumentOfficial finding18 Sep 2026 00:00 UTC

MH370 / US Military ISR Working Research Report v1

Working paper · 18 September 2026

Working paper on US military ISR programmes in the MH370 window: MAGIC, Orion, Gorgon Stare, Blue Devil and remote-control patents, read as one overlapping family under BIG SAFARI. The family is documented. A specific MH370 collection is not established and is not ruled out.

TimelineConfirmed24 Mar 2014

MyCERT: MH370-themed backdoor and fake-transcript spear-phish

MA-381 · 24 March 2014 · MA-386 · 18 April 2014

Confirmed public advisories, a different campaign from the 9 March official-network intrusion. 24 March: a Facebook-app lure dropping a backdoor with remote-control (C2) capability. 18 April: emails posing as an investigation team / ICAO portal item, password-protected archive, fake MH370 transcript, command-and-control. Aimed at organisations and the public, not shown to be the DCA/NSC/MAS breach.

ClaimConfirmed

No group claimed MH370

Twelve years on, no organisation has issued a credible claim of responsibility. Absence of a claim is not proof of innocence; it is a fact that sits next to the stolen passports.

Open questionOpen

What is the bridge from the ISR family to MH370?

Gorgon Stare, Blue Devil and MAGIC/Orion are a documented family under BIG SAFARI. The open question is one specific platform, sensor, command link, contract, deployment or test event in both that family and the MH370 window. Until that object is found, involvement is not established — and is not ruled out.

Open questionOpen

Why did SAR start in the wrong ocean for days?

Military primary radar and live SATCOM existed while the public search flew the South China Sea. Minister ~10:30 MYT; KL ARCC 22:30; Thai Surat Thani 18–19 March. GADSS is the policy answer; the night-of organisational failure is still a research subject.

PersonUnverified

Ashton Forbes

Independent researcher · alleged thermal and wide-area video

Source of widely circulated alleged thermal/WAMI videos and platform identifications. Those identifications are hypotheses, not findings. Plasma-orb claims are treated as unsubstantiated. A third-party extract of 824 of his videos is a claim list, not proof. Edward C. Lin FOIA does not name MH370.

EvidenceProbable1 Jan 2012

Aurora Orion contract FA8620-12-C-3027

~$86.56m aggregated · completion extending to 2019

Public award aggregation for the BIG SAFARI / Orion definitive contract. Transaction-level FPDS history — especially modifications August 2013–March 2014 — is still open. Budget authority, ceilings and obligations are not the same as cash spent.

TimelineConfirmed23 May 2012 00:00 UTC

Blue Devil II stopped; hardware to Greenville

Payload stop 4 Jan 2012 · pack-out May 2012 · storage Q4 FY2012

Airship programme killed. Equipment packed and transferred to a BIG SAFARI-managed facility in Greenville, Texas. Components were available for other projects. Residual parts were later absorbed into other Air Force programmes.

EvidenceConfirmed1 Mar 2014

CTBTO HA08 North at Diego Garcia went dark in March 2014

Cable break ~189 km offshore · South array kept listening

Confirmed by CTBTO. The northern hydroacoustic segment of HA08, off Diego Garcia, suffered a trunk-cable fault in March 2014 about 189–190 km from shore, more than a kilometre and a half down. HA08 South continued. North stayed silent for twelve years. A conventional splash in the southern Indian Ocean is not thereby erased — Cape Leeuwin (HA01) and HA08 South remained in the network.

LocationConfirmed

Greenville, Texas

BIG SAFARI facility · Blue Devil II GFE available for other programmes

Q4 FY2012 destination of stopped Blue Devil II airship equipment, including government-furnished components. FY2014 USAF budget language: components available for other projects. Later inventory, including March 2014, is not published.

DocumentOfficial finding20 Sep 2026 00:00 UTC

MH370 Research Master Log

Investigation chronology · 18–20 September 2026

Running chronology of findings: cargo, 2011–2013 ISR programmes, radar disclosure on the westbound track, MAGIC budget exhibits, and the alleged-video file.

DocumentConfirmed1 Feb 2011

OSD PB2012 — MAGIC JCTD primary record

PE 0603648D8Z · pp. 32–33 · USCENTCOM sponsor

Primary OSD budget exhibit: MAGIC is a USCENTCOM-sponsored JCTD. 120-hour sortie, nominal 1,000 lb / maximum 2,600 lb at 15,000 ft. Modular payload classes: EO/IR, SIGINT, GMTI, wide-area surveillance, communications relay, strike. Transition named to USAF 303rd AESW.

EvidenceConfirmed19 May 2014

RegicideAnon satellite-video upload — 19 May 2014

Public upload date archivable; claimed 12 March receipt is not verified by that fact

Confirmed public-upload date. Description’s claimed ‘received 12 March 2014’ remains a separate, unverified field. Provenance of the file itself is still the core video question.

Open questionOpen

What platform received the FY2013 dual-band RF Persistent Sensing integration?

PB2015: completed and integrated onto an ‘identified platform,’ then the effort ended. Public exhibits do not name it. FIRST RF / Shadow 200 and ISIS test-facility work are documented UHF/X-band alternatives. Orion is chronology-only.

Open questionOpen

Where did Blue Devil residual components go?

Block 2 equipment, including government-furnished components, was packed and transferred to a BIG SAFARI-managed facility in Greenville, Texas, available for other projects. Residual parts were absorbed into other Air Force programmes. Later inventory — including March 2014 — is not published.

273 records in the file.